NASA Awards $48 Million Contract To ATK Launch Systems | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Jan 08, 2007

NASA Awards $48 Million Contract To ATK Launch Systems

UT-Based Company Will Continue Development Of Ares I First Stage

Aero-News learned Monday NASA has authorized a $48 million contract for ATK Launch Systems of Brigham City, Utah, to continue design and development of the first stage for the Ares I crew launch vehicle.

The first stage will consist of a single reusable solid rocket booster and motor similar to those used on the space shuttle, but with a fifth motor segment added. The upper stage will consist of a J-2X liquid hydrogen, liquid oxygen engine and the associated propellant tanks and fuel distribution systems.

Ares I will transport the Orion crew exploration vehicle and its crew of up to six astronauts, or other small cargo payloads, to low-Earth orbit.

This Ares I first stage contract action will increase a first stage task under an existing shuttle contract by $48 million for a total work effort valued at $111 million. These activities are a preparatory effort leading up to the Ares I first stage prime contract, which will be awarded in the February 2007 timeframe.

NASA states the contract action maintains the design, development, test and evaluation schedule; expedites the procurement of new nozzle metal hardware and production tooling for propellant casting and nozzle fabrication; maintains the necessary design and engineering analysis; and continues participation in pilot parachute development tests.

The action also provides support for an initial test flight in the spring of 2009 known as Ares I-1 and provides support for Ares I-1 in preparation for Preliminary Design Review. The test flight will use a simulated fifth segment on the first stage and a simulated upper stage.

FMI: www.nasa.gov/ares, www.atk.com/CorporateOverview/corpover_thiokol.asp

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC