Mon, Feb 11, 2019
Covers Pilots, Maintainers And Weapons Loaders
L3 Technologies has been awarded a $120 million contract to continue training United States Air Force B-2 pilots, maintainers and weapons-loading personnel using its B-2 Aircrew Training System. L3 has been the Original Equipment Manufacturer (OEM) and provider of the B-2 Training System since 1984.
“We are honored to continue our legacy of providing the Air Force with world-class training and simulation in support of mission readiness,” said Christopher E. Kubasik, L3’s Chairman, Chief Executive Officer and President. “We are intensely focused on delivering innovative technologies that align with the demand for pilots and crewmembers who are on the front lines of national security.”
As the OEM with two previous B-2 pilot training contracts, L3 has been the sole source for delivering B-2 Aircrew and Maintenance Training System modifications to fulfill pilot training requirements and to train and certify weapons-loading crewmembers. Training is conducted at the 509th Bomb Wing, Whiteman Air Force Base, in Missouri. In addition, the L3 Training Systems Support Center (TSSC) located at Whiteman Air Force Base provides on-site engineering support.
“L3 is dedicated to ensuring that all Air Force B-2 personnel receive the best training they can for their critical and unique missions,” added Lenny Genna, President of L3 Link Training & Simulation. “Over three-plus decades, we’ve continually enhanced our solution based on direct feedback from the operators. We value our strategic relationship with the Air Force and are committed to offering world-class training for years to come.”
With headquarters in New York City and approximately 31,000 employees worldwide, L3 develops advanced defense technologies and commercial solutions in pilot training, aviation security, night vision and EO/IR, weapons, maritime systems and space. The company reported 2018 sales of $10.2 billion.
(Source: L3 Technologies news release)
More News
Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]
A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]
Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]
Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]
From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]