AD: General Electric Company Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Feb 19, 2020

AD: General Electric Company Turbofan Engines

AD NUMBER: 2020-01-55

PRODUCT: Certain General Electric Company (GE) GE90-110B1 and GE90-115B model turbofan engines.

ACTION: Final rule; request for comments.

SUMMARY: This AD was sent previously as an emergency AD to all known U.S. owners and operators of the GE GE90-110B1 and GE90- 115B model turbofan engines with certain engine serial numbers.

This AD requires the removal from service of the interstage seal, part number 2505M72P01 or 2448M33P01, from the affected engines. This AD was prompted by a recent event involving an uncontained high-pressure turbine (HPT) failure that resulted in an aborted takeoff.

DATES: This AD is effective March 2, 2020 to all persons except those persons to whom it was made immediately effective by Emergency AD 2020-01-55, issued on January 17, 2020, which contained the requirements of this amendment. The FAA must receive comments on this AD by March 30, 2020.

COST: The FAA estimates that this AD affects 0 engines of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Remove interstage seal

  • Labor: 100 work-hours × $85 per hour = $8,500
  • Parts: $509,600
  • Cost per engine: $518,100
FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC