Boeing P-8I Begins Flight Test Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.24.15

Airborne 08.25.15

Airborne 08.26.15

Airborne 08.27.15

Airborne 08.28.15

Airborne Hi-Def On YouTube

Airborne 08.24.15

Airborne 08.25.15

Airborne 08.26.15

Airborne 08.27.15

Airborne 08.28.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Mon, Jul 16, 2012

Boeing P-8I Begins Flight Test Program

Military Derivative 737 For India On Schedule For 2013 Delivery

The first P-8I aircraft for the Indian Navy began its official flight test program July 7, taking off from Boeing Field in Seattle at 0915 and landing three hours and 49 minutes later after demonstrating flying qualities and handling characteristics. The flight went as planned with all test objectives met.

The P-8I is one of eight long-range maritime reconnaissance and anti-submarine warfare aircraft Boeing is building for India as part of a contract awarded in January 2009. During the coming months, Boeing test pilots will put the P-8I, a Next-Generation 737-800 derivative, through its paces over a U.S. Navy test range west of Neah Bay, WA, and a joint U.S./Canadian test range in the Strait of Georgia.
 
"Today's flight is another on-time milestone for the program," said Leland Wight, Boeing P-8I program manager. "We'll start out testing the P-8I's mission system, which includes its sensors and communication systems. The team then will transition to 'stores' tests during which the P-8I will carry inert weapon shapes under its wings to demonstrate that the aircraft is capable of carrying all the weapons the Indian Navy will use during regular missions."
 
The stores the P-8I will carry will have the identical shape and size of real weapons, including the Harpoon anti-ship missile, depth bombs and torpedoes.
 
"This is an important milestone for the program and sets the stage for operational testing and weapons certification as we move closer to P-8I aircraft joining the Indian Navy," said Rear Adm. DM Sudan, assistant chief of Naval Staff (Air), Indian Navy.
 
P-8I flight and weapons testing follows on the heels of similar testing for the U.S. Navy's P-8A Poseidon. P-8I is a variant of the Poseidon. In order to efficiently design and build the P-8I and the P-8A, the Boeing-led team is using a first-in-industry, in-line production process that draws on the company's Next-Generation 737 production system. Assembly is complete on the second P-8I aircraft and it will make its first flight in the coming weeks.
 
The P-8I features open system architecture, advanced sensor and display technologies, and a worldwide base of suppliers, parts and support equipment. P-8I aircraft are built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems, BAE Systems and GE Aviation.
 
The Boeing-led team is on track to deliver the first aircraft to the Indian Navy in 2013.

(Image provided by Boeing)

FMI: www.boeing.co.in

Advertisement

More News

RFP: ANN Considering Future Options For HQ Relocation

A Very Bright Future For ANN, Aero-TV, and Airborne May Require Some New Digs ANN may be looking for a new home... hopefully, a permanent one. We're currently inviting proposals fo>[...]

Airborne 08.28.15: 'Big' Bezos Announcement?, MA Aero-Taxes, Harrison Ford

Also: Barnstorming: The FAA v Hoover Fight Ain’t Over, Hail-Damaged Dreamliner, UAV Shooter Charged, NASA Global Hawk, MiG-21 Lancers, ICAO Manual Blue Origin founder and Ama>[...]

Airshow Pilot Lost In In-Flight Breakup

Andrew Wright Lost As Giles G-202 Suffers Fuselage Seperation/Failure It's been a tough few weeks for the airshow industry... and now this -- a practice flight, Friday, August 28th>[...]

Aero-News: Quote Of The Day (08.30.15)

“This contract extension is significant for the TSA pilots. Our last round of negotiations that resulted in our current contract took more than five years, so we are pleased >[...]

ANN's Daily Aero-Term (08.30.15): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth’s surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clut>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC