US Air Force, Boeing Finalize KC-46A Tanker Aircraft Design | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Sep 06, 2013

US Air Force, Boeing Finalize KC-46A Tanker Aircraft Design

Boeing 'On Track' To Deliver 18 Combat-Ready Tankers By 2017

The U.S. Air Force and Boeing have validated the final design elements of the KC-46A Tanker and concluded that the proposed design embodies and can meet Air Force requirements, clearing the way for production and testing of the next-generation aerial refueling tanker. "I'm pleased to report that the design of the KC-46A tanker has been locked down," said Air Force Maj. Gen. John Thompson, Air Force Program Executive Officer for Tankers. "This is great news for the nation’s warfighters. The joint government and Boeing team stayed focused on the design review objectives, and truly delivered."

Following months of component and subsystem reviews, the Air Force and Boeing held a KC-46A Weapon System Critical Design Review July 8-10.

The KC-46A is based on the commercial Boeing 767-200ER, a proven airframe in service worldwide as an airliner, freighter and tanker. The company has delivered more than 1,050 767s. "The KC-46A's design is all about giving the warfighter an edge," said Maureen Dougherty, Boeing vice president and KC-46 program manager. "The aircraft’s powerful, multi-role capabilities and high reliability will mean greater effectiveness and availability to meet more mission requirements."

Boeing began assembling the wing for the first tanker aircraft on June 26. If all options under the current contract are exercised, Boeing expects to deliver 179 tankers so the Air Force can begin replacing its fleet of KC-135 Stratotankers. By 2017, Boeing is to build four test aircraft and deliver 18 combat-ready tankers.

(USAF image)

FMI: www.af.mil, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC