NGC To Break Ground On Space Assembly And Test (M-SAT) Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Jul 13, 2014

NGC To Break Ground On Space Assembly And Test (M-SAT) Facility

Represents $20 Million Investment In New 25,000 Square Foot Building

Northrop Grumman Corporation is investing $20 million to construct a new 25,000 square foot facility to handle space payload integration programs. Construction begins this month and will be completed by a Maryland-based construction company during the summer of 2015. The building will house up to 80 engineers and technicians working on space systems assembly, integration and testing.

U.S. Sen. Ben Cardin and U.S. Reps. C. A. Dutch Ruppersberger and John Sarbanes are expected to attend the groundbreaking. They will be accompanied by Gloria Flach, corporate vice president and president, Northrop Grumman Electronic Systems, and other company officials.

The ceremony will be held at 3:00 p.m. EDT Monday, July 14, at the Back lot of Northrop Grumman Electronic Systems' BWI Campus in Linthicum, MD.

Northrop Grumman has been a pioneer in designing and producing payloads, sensors, systems and solutions for use in space for more than 50 years. From the Gemini Rendezvous Radar Pod to the Apollo 11 Lunar Camera that broadcast man's first steps on the moon, the company's space heritage also includes the Defense Meteorological Satellite Program, the Defense Support Program and the Space-Based Infrared System.

FMI: www.northropgrumman.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC