Cornerstone Laid For New Bombardier Facility In China | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Mar 26, 2010

Cornerstone Laid For New Bombardier Facility In China

Construction Of Factory That Will Manufacture CSeries Aircraft Fuselage Underway

Construction of the facility that will build the fuselage for the all-new Bombardier CSeries mainline commercial jetliner has begun. The event - another step in Bombardier's progress toward a 2013 entry-into-service for the CSeries aircraft - was marked with a foundation stone-laying ceremony today at the site in Shenyang, China.

The 226,042 sq. ft. facility will be operated by Shenyang Aircraft Corporation (SAC), a subsidiary of the state-owned aviation industrial entity, China Aviation Industry Corporation (AVIC). SAC is a key supplier in the Bombardier CSeries aircraft program.

Pierre Beaudoin, President and Chief Executive Officer, Bombardier Inc. took part in the ceremony at the Shenyang National Aviation and High Technology Industrial Base in Dongling District.

"Bombardier believes in the China aviation industry and is encouraged to see the further development of the Shenyang National Aviation and High Technology Industrial Base as a center of design and manufacturing excellence," Beaudoin said.

SAC delivered the first test article in the CSeries aircraft program - a fuselage test barrel - to Bombardier's Saint-Laurent, Quebec site on August 19, 2009. The test barrel is being used to demonstrate manufacturing and engineering structural concepts before the CSeries aircraft's final design phase begins later this year. It has already been subjected to 40,000 simulated flight cycles of testing.

The Shenyang facility joins two other new CSeries aircraft installations that are already under construction. In September 2009, Bombardier celebrated the groundbreaking of the first CSeries aircraft building in Quebec, Canada. Located in Mirabel, 45 minutes north of Montreal, the Complete Integrated Aircraft Systems Test Area (CIASTA) will test aircraft systems for reliability and functionality one year before the first prototype aircraft flies. In November 2009, construction got under way on the company's new state-of-the-art aircraft wing manufacturing and assembly facility in Belfast, Northern Ireland.

FMI: www.bombardier.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC