NASA and SpaceX 'Go' for Dec. 5 Cargo Resupply Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Nov 25, 2020

NASA and SpaceX 'Go' for Dec. 5 Cargo Resupply Launch

Planned Liftoff At 1139 EST On Saturday, 12/5, From Launch Complex 39K

NASA and SpaceX managers conducted a Flight Readiness Review (FRR) Monday, Nov. 23, for SpaceX’s 21st Commercial Resupply Services (CRS-21) mission to the International Space Station.

To enable additional time to evaluate flight data from Crew-1 and close out certification work ahead of this first flight of the cargo version of Dragon 2, teams are now proceeding toward a planned liftoff at 11:39 a.m. EST on Saturday, Dec. 5, from Launch Complex 39A at the agency’s Kennedy Space Center in Florida, with the Dragon spacecraft arriving to autonomously dock at the orbiting laboratory on Sunday, Dec. 6, at approximately 11:30 a.m.

The science to be delivered on this mission includes a study aimed at better understanding the effects of microgravity on cardiac function in human heart tissue, research into how microbes could be used for biomining on asteroids, and a tool being tested for quick and accurate blood analysis in microgravity.

The first commercially owned and operated airlock on the space station, the Nanoracks Bishop Airlock, will arrive in the unpressurized trunk of the Dragon spacecraft. Bishop will provide a variety of capabilities to the orbiting laboratory, including CubeSat deployment and support of external payloads.

FMI: www.spacex.com, www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC