FAA SAIB: Gulfstream Flight Compartment Windows | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Dec 12, 2019

FAA SAIB: Gulfstream Flight Compartment Windows

Agency Has Received At Least 20 Reports Of Windshield Failures Since 2013

The FAA has released a Special Airworthiness Information Bulletin (SAIB) following reports of multiple windshield failures on  Gulfstream Aerospace Corporation G-1159A (G-III), G-IV, GIV-X, GV, GV-SP, and GVI airplanes.  It also provides information on a new windshield design that should be used if replacement of an existing windshield becomes necessary.

According to the SAIB, since 2013, the FAA and Gulfstream are aware of at least 20 incidents involving windshield failures.

The failures resulted in one or more of the following: arcing, cracking, smoke, and/or small fires. In some cases, this has resulted in diversions or emergency landings.

Gulfstream has designed and now manufactures a new windshield with an improved heater terminal block. Since the same windshields are common to multiple models of Gulfstream airplanes, in most cases these new windshields may be used as replacements.

For Pilots: The FAA recommends that because of potential difficulty determining which windshield ply is affected, if you experience a windshield cracking event, assume that a structural windshield ply is affected, and follow the appropriate airplane flight manual emergency procedure (G-1159A (G-III) and G-IV), or abnormal procedure (GIV-X, GV, GV-SP, and GVI), which includes pulling the associated windshield heat circuit breaker.

For Maintenance Personnel: The FAA recommends that when being replaced, use the new design windshields. These windshields have upgraded/redesigned terminal block part numbers:

  • Windshield (Left), 1159SCB5102-13
  • Windshield (Right), 1159SCB5102-15

(Image from file)

FMI: SAIB

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC