AD: Gulfstream | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.19.14 ** HD iPad-Friendly -- Airborne 09.19.14 **
** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **

Thu, Apr 08, 2004

AD: Gulfstream

AD NUMBER: 2004-07-21
MANUFACTURER: Gulfstream
SUBJECT: Airworthiness Directive 2004-07-21
SUMMARY: This amendment adopts a new airworthiness directive (AD), applicable to certain Model Astra SPX and 1125 Westwind Astra series airplanes, that requires detailed inspections and resistance measurements of the starter generator electrical cables of both engines to detect damage, and replacement of the electrical cable and cable support if any damage is found. This amendment also requires eventual replacement of the cable support. This action is necessary to prevent chafing of the starter generator cable, which could result in electrical arcing in the vicinity of a fuel line, and possible fire or explosion. This action is intended to address the identified unsafe condition.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20040721

Advertisement

More News

Airborne 09.17.14: Boeing/SpaceX Win CCtCap, Flying Docs Endorse, Jetpack Bucks

Also: Chris Heintz, Lear 70/75 Certs, Beluga Birthday, Leap Frogs 9/11 Jump Cancelled, Lawyers Sue NTSB The Commercial Spaceflight Federation congratulates NASA and the winners of >[...]

AD: Embraer S.A. Airplanes

AD NUMBER: 2014-19-01 PRODUCT: Embraer S.A. Model EMB-505 airplanes (Phenom 300)>[...]

ANN's Daily Aero-Linx (09.19.14)

Basejumper.com A site dedicated to the sport of BASE jumping. BASE is an acronym which stands for Building, Antenna, Span and Earth.>[...]

ANN's Daily Aero-Term (09.19.14): Breakout

A technique to direct aircraft out of the approach stream. In the context of simultaneous (independent) parallel operations, a breakout is used to direct threatened aircraft away f>[...]

Aero-News: Quote Of The Day (09.19.14)

"We're actually already in the process of putting some framework together, but we're going to hit the ground running when we get back in January." Source: U.S. Representative Sam G>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC