AEA Offers Cost-Effective Training Program Solutions for Repair Stations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Feb 03, 2006

AEA Offers Cost-Effective Training Program Solutions for Repair Stations

First Compliance Deadline Nears

The Aircraft Electronics Association conducted the first in a series of seminars designed to help Part 145 repair stations of all types develop and manage their soon-to-be required training programs. The one-day seminar takes the complexity and confusion out of the regulatory guidance material and demonstrates cost-effective and efficient measures to comply with the new rule.

Nearly 70 workshop attendees, including FAA personnel, repair station owners/managers, training directors and quality directors convened on the campus of Tarrant County College in Fort Worth, Texas, in late January, to learn how to perform needs assessments, develop courses, properly identify training needs, sources and methods, and learn proper documentation practices.

In addition to leaving with a better understanding of the scope of the new rule and the best methods to comply, workshop attendees received a free copy of AEA’s newly released Repair Station Training Program Development CD. The CD, which includes access to AEA’s exclusive Repair Station Training Program Development Tool, dissects the inspector’s guidance material, breaks down the Advisory Circular and helps write the training program.

The CD and the three remaining seminars are available at a fraction of the cost of many other commercially available offerings.

FMI: www.aea.net/rstp

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC