NASA Partners With Forest Service On Air Tanker Safety Study | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Tue, Oct 07, 2008

NASA Partners With Forest Service On Air Tanker Safety Study

Will Evaluate Performance Of DC-10, 747 Very Large Tankers

NASA is partnering with the US Department of Agriculture's Forest Service on a project to examine the mission suitability of Boeing 747 and McDonnell Douglas DC-10 fire retardant delivery aircraft.

The aircraft under study are a DC-10 belonging to 10 Tanker Air Carrier LLC and a 747 owned by Evergreen International Aviation, Inc. The DC-10 tanker has already been successfully employed by the California Department of Forestry and Fire Protection in past wildfire suppression missions.

NASA's Dryden Flight Research Center at Edwards Air Force Base, CA is working with the Forest Service to help determine the safe flight envelope for these very large air tanker aircraft for both the Forest Service and the US Department of the Interior. Additionally, NASA Dryden will recommend operational usage regimes, policies and procedures for the aircraft. The Forest Service and the Interior Department approached NASA for help because NASA provides a range and depth of necessary flight test planning skills to develop and conduct the assessment.

Mark Dickerson, Dryden project manager, calls this important work.

"The entire team is very excited about helping the forest service with this effort. It is a bit different from our typical research projects, but we all enjoy being able to help find new tools to fight wildfires," Dickerson said.

As project lead, NASA Dryden is performing operational test and evaluation assessments. Project engineers will report findings and recommendations on these aircraft in cooperation with NASA's Ames Research Center at Moffett Field, CA. NASA Ames' engineers are supporting the effort with pilot-in-the-loop simulations and are coordinating simulator models, flight profiles & data analysis with project staff at NASA Dryden.

Engineers at NASA Dryden will also develop, implement, and direct an evaluation test plan for use in flight test and in simulation. The test plan will be designed to evaluate the suitability of large tanker aircraft for the firefighting mission environment. Based on this analysis, NASA will propose appropriate interim flight envelope limitations to enhance safety and operational utility in the fire retardant delivery mission.

NASA Dryden personnel are working with the crews of the large tanker aircraft to capture flight validation data, assess the effectiveness of proposed procedures, and refine those as required. The final project report will include initial recommendations for such factors as flight over various terrain types, density altitude limits, turbulence, and horizontal wind shear limits.

FMI: www.nasa.gov/centers/dryden

Advertisement

More News

AeroSports Update: Medical Rules For Pilots Without Medicals

Sport Pilots And Glider Pilots Flying Without Medicals Must Comply With Fit-For-Flight Rules In a letter sent to all U.S. Senators, the Airline Pilots Association’s (ALPA) pr>[...]

ANN's Daily Aero-Linx (07.29.15)

Homebuilt Homepage The Homebuilt Homepage is an index and reference on Homebuilt Experimental class aircraft and related information. This is a non-profit website.>[...]

ANN's Daily Aero-Term (07.29.15): Expect Departure Clearance Time

The time issued to a flight to indicate when it can expect to receive departure clearance. EDCTs are issued as part of Traffic Management Programs, such as a Ground Delay Program (>[...]

Aero-News: Quote Of The Day (07.29.15)

“The avionics repair shop industry in the U.S. has only 53 months remaining to equip the entire general aviation fleet of more than 100,000 aircraft with ADS-B Out equipment.>[...]

ANN FAQ: Getting The Word Out

Things To Know When You Send A News Release Aero-News gets hundreds of releases every week, ranging from industry giants like Boeing and Cessna to the smallest of flying clubs and >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC