Mu-1 Barrier Attempt Pushed Back, Probably to Spring, 2004 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Oct 11, 2003

Mu-1 Barrier Attempt Pushed Back, Probably to Spring, 2004

Carter Puts Mu-1 Barrier Attempt on Hold

Carter Aviation Technologies (Carter Copters) is announcing that their attempt to break the "Mu-1 barrier" for rotorcraft, recently scheduled for November 22, 2003, has been put on hold. The attempt was scheduled in conjunction with the Organization for Sport Aviation Competition's (OSAC) Air Games at the Texas Motor Speedway in Ft. Worth (TX).

According to Carter President, Jay Carter, Jr., the critical flight-testing phase prior to advancing to Mu-1 has not been completed. The original November date for the Mu-1 attempt was set last spring prior to a wheels-up landing that caused extensive damage to the engine compartment on the Carter prototype.

Springtime trouble spawned opportunity.

Repairs to the fuselage are now complete, but Carter took the opportunity to upgrade the engine from a 300 hp to a 400 hp, turbocharged engine. This new engine is being developed to take Carter's next generation prototype far beyond Mu-1. Changes to the fuselage to accommodate the new engine were fairly straightforward. However, calibrating the engine computer with the turbo added and rewiring the computer systems that download 60 channels of information during flight-testing has been very challenging. In addition to the engine upgrade, Carter took advantage of the downtime to revamp and upgrade some systems that were causing intermittent problems. They also upgraded their patented landing gear to simplify the retraction and extension system and make it more reliable.

Jay Carter commented, "We are moving out of the research stage into more of a development stage.  Our basic technology has been proven with almost 100 hours of successful flight-testing. We are now progressing to the next level and conquering Mu-1 is the first step in expanding the scope of our technology. There are risks involved and our approach has always been one of 'safety first.'  If exceeding Mu-1 was an easy process the barrier would have been broken long before now."

[The OSAC Air Games are also being rescheduled to accommodate a later date for the Mu-1 attempt.  No specific date has been set for the new event. Indications are that it will take place in the spring of 2004 --ed.]

FMI: www.carteraviationtechnologies.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC