Where Do You Want It? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Sep 15, 2003

Where Do You Want It?

ISS Crew Offloading Three Tons Of Progress Supplies

The unloading of nearly three tons of new supplies from a Progress cargo vehicle began in earnest this week aboard the International Space Station. Commander Yuri Malenchenko and NASA ISS Science Officer Ed Lu spent time each day unpacking, cataloging and stowing the equipment.

The ISS Progress 12 (12P) vehicle brought food, fuel and equipment to the Station Aug. 30,US time. This week, the thrusters on 12P were successfully tested and can be used to increase the Station's altitude when necessary. Also, nitrogen from the cargo vehicle's gas tanks was used to add pressure to the atmosphere inside the Station, while oxygen repressurization from 12P will occur later.

Among the new supplies were two canisters for the Resistive Exercise Device weightlifting machine, which Lu installed Friday. Coincidentally, Lu had trouble adjusting the resistance on one of the previous canisters Wednesday. He removed that set and will work to repair the problematic canister next week so that the new ones that arrived on Progress can be reserved for the next crew to live aboard the Station.

Friday, flight controllers in Mission Control Houston worked on the communication link between the Space Station and control centers in Houston (TX), Moscow and Huntsville (AL). The crewmembers noticed they were barely able to hear voice calls from the capcoms, or spacecraft communicators, from each of the centers. The problem was narrowed down to equipment in Houston that relays the audio to the Station from all the control centers.  Engineers will continue to troubleshoot the issue with the hardware. In the meantime, the audio link to the Station has been restored to normal levels by temporarily bypassing that specific piece of hardware.

FMI: http://spaceflight.nasa.gov

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC