Boeing Celebrates Grand Opening Of 777X Composite Wing Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, May 24, 2016

Boeing Celebrates Grand Opening Of 777X Composite Wing Center

Investment Of More Than $1 Billion Sustains Thousands Of Puget Sound Jobs

Boeing employees recently joined with community leaders from across the region to celebrate the grand opening of its new 777X Composite Wing Center (CWC) in Everett, WA.

The facility, located on the north side of the main final assembly building, will manufacture the world's largest composite wings for the 777X, the company's newest commercial jetliner, and sustain thousands of Puget Sound area jobs.

Boeing has invested more than $1 billion in the Everett site for construction and outfitting of the new building. "[This] event is bigger than celebrating the opening of a magnificent new building," said Boeing Commercial Airplanes President and CEO Ray Conner. "It's about our employees, and shared success with our partners around the region and in Olympia in keeping the Puget Sound at the forefront of aerospace leadership for decades to come."

Construction of the new CWC building required approximately 4.2 million hours of construction time. At its peak, 1,700 contract employees worked on the project. By the numbers, the new building required:

  • 31,000 tons of steel with the highest beams weighing 720 pounds per foot.
  • 480 miles of electrical cable.
  • 80,000 linear feet of process piping.
  • 170,000 cubic yards of concrete were poured. The concrete was brought to the site by more than 16,500 truckload deliveries.

The CWC is more than 27 acres under one roof – the equivalent to 24 football fields. It will contain three of the world's largest autoclaves – each big enough to fit two Boeing 737 fuselages inside.

To date, the 777X has accumulated 320 orders and commitments from six customers worldwide. Production of the 777X is scheduled to begin in 2017, with first delivery targeted in 2020.

(Source: Boeing news release. Images from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC