Boeing Starts Assembly Of First 737 MAX | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Jun 04, 2015

Boeing Starts Assembly Of First 737 MAX

New Single-Aisle Airplane On Track For First Delivery In Third Quarter 2017

Boeing  employees in Renton, WA have started building the first 737 MAX on schedule. Last week, employees started to assemble the wings for the first 737 MAX flight test airplane. Wings are the first 737 components to be assembled in the Renton production process.

“Employees in Renton are the best in the world at building single-aisle airplanes and now this world-class team is building the future with the first 737 MAX,” said Keith Leverkuhn, vice president and general manager, 737 MAX. “Achieving this milestone on schedule is a testament to the success of the 737 and our integrated design and build team.”

Machine operators loaded 737 MAX wing skin panels and stringers into the new panel assembly line that uses automation to drill holes and install fasteners in the upper and lower wing panels. Mechanics also loaded the initial parts of the first 737 MAX spars – internal support structures in wings – into automated spar assembly machines. The unfinished skins, stringers and spars were machined by Boeing Fabrication Skin and Spar in Auburn and Fredrickson, WA. When finished, the panels and spars will be transformed into completed wings.

“It’s really exciting to be starting something that you know is going to be in the future and that you are going to be building,” said David Dowell, 737 mechanic. “I’m looking forward to it and future growth.”

The wings will be attached to the first 737 MAX fuselage on the new Central line in Renton Final Assembly later this year. The new production line will allow the team to isolate the first 737 MAX build from the rest of production in order to learn and perfect the build process while the Renton factory continues to build at a rate of 42 airplanes a month.

The 737 MAX incorporates the latest technology CFM International LEAP-1B engines, Advanced Technology winglets and other improvements. Boeing projects that beginning in 2017, the new single-aisle airplane will deliver 20 percent lower fuel use than the first Next-Generation 737s and the lowest operating costs in its class – 8 percent per seat less than its nearest competitor. To date, the 737 MAX has 2,720 orders from 57 customers worldwide.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC