USAF Selects Lockheed Martin To Advance U-2 For The Future | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Apr 27, 2020

USAF Selects Lockheed Martin To Advance U-2 For The Future

Contract Underpins U-2’s Role in Bridging Capabilities Needed for Next Generation Battlespace

The venerable U-2 'Dragon Lady' still has a place in the battlespace... and its capabilities are about to be upgraded. As such; Lockheed Martin Skunk Works continues to evolve the U-2 Dragon Lady to support future battlespace needs under a recent contract award from the U.S. Air Force valued at $50 million.

The contract includes the following upgrades to the Dragon Lady:

  • An updated avionics suite that modernizes the U-2’s onboard systems to readily accept and use new technology.
  • A new mission computer designed to the U.S. Air Force’s open mission systems (OMS) standard that enables the U-2 to integrate with systems across air, space, sea, land and cyber domains at disparate security levels.
  • New, modern cockpit displays to make everyday pilot tasks easier while enhancing presentation of the data the aircraft collects to enable faster, better informed decisions.

“As a proven, agile and reliable aircraft, the U-2S is the most capable high-altitude ISR system in the fleet today. The Avionics Tech Refresh contract will continue our commitment of providing a premier aircraft to our warfighters, ensuring global security now and into the future,” said Irene Helley, U-2 program director.

Under this contract, Lockheed Martin will lead the design, integration and test of the new advanced aircraft components, which will enable the U-2 to be the first fully OMS-compliant fleet. Interim fielding is anticipated to begin in mid-2021, with fleet modification expected in early 2022.

FMI: www.lockheedmartin.com/u2

 


Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC