Joby Restarts Flight Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 29, 2022

Joby Restarts Flight Testing

Manufacturing Facility Underway, 1st Production Aircraft to Begin Soon

Joby has picked itself up and dusted off, restarting flight testing following the crash of an uncrewed test aircraft last month. 

Joby has announced that the second preproduction prototype aircraft has resumed flight testing at the company's first manufacturing facility in Marina, California. The company's flight testing was paused following the crash of their first prototype while undergoing uncrewed evaluation, the cause of which remains under investigation by the NTSB, the FAA, and the company's review board. The second aircraft was fortuitously built in late 2021 in the hopes that it could further accelerate the pace of testing and certification. Entering service in January, it has managed to rack up almost 40 flights, according to Joby systems head Didier Papadopoulos. 

“We’re excited to be back in the air with our second pre-production prototype aircraft, building on the tremendous flight test achievements our team has made to date. Last year alone, we flew more than 5,300 miles, generating 65 terabytes of flight test data and demonstrating an endurance of 154.6 miles on a single charge.”

The company told investors that despite the incident, things are looking up across the board. They remain about 4/5ths of the way through their Part 135 certification, saying "We continue to make excellent progress on finalizing our means of compliance and have submitted our first area-specific certification plan." Their production facility remains under construction, with an eventual 125,000 square feet of space for the line. They believe the first production aircraft will be started in the near future. 

FMI: www.jobyaviation.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC