Third C-130 AMP Aircraft Flies Ahead Of Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 08.17.17

Airborne 08.21.17

Airborne 08.22.17

Airborne 08.23.17

Airborne 08.24.17

Airborne 08.18.17

Airborne-Unmanned 08.22.17

Airborne-YouTube

AMA 08.17.17

Airborne 08.21.17

Airborne 08.22.17

Airborne 08.23.17

Airborne 08.24.17

Airborne 08.18.17

Airborne-Unmanned 08.22.17

NEW!!! 2017 AirVenture Innovation Preview -- YouTube Presentation / Vimeo Presentation

Fri, Mar 20, 2009

Third C-130 AMP Aircraft Flies Ahead Of Schedule

Modification Program Adds Glass Capabilities To Stalwart Transports

Boeing disclosed this week it successfully completed the first test flight of the US Air Force's third C-130 Avionics Modernization Program (AMP) aircraft on January 17, three weeks ahead of schedule. The flight marked another milestone for the most comprehensive C-130 avionics modification ever conducted.

The H3 aircraft accomplished both functional check flight and acceptance check flight tests. Boeing test pilot Mike Leone conducted the two-hour flight from the Boeing facility in San Antonio.

"The joint effort between Boeing and our Air Force customer continues to enable the C-130 program to reach critical milestones ahead of schedule and under cost," said Mark Angelo, Boeing C-130 AMP program manager. "We are proud to continue to provide the Air Force with a modern tactical airlift platform."

Boeing completed the major modification and upgrade package on H3 about 13 percent faster than the upgrade to H2.5. H3 will soon join aircraft H2 and H2.5 in the flight test program, which is 81 percent complete.

The Air Force and Boeing signed a contract on Sept. 30 for the first two Low Rate Initial Production (LRIP) AMP kits. Boeing plans to provide a total of 26 kits, engineering services, training and logistics support during LRIP. The company will also install production kits on 11 of the C-130 aircraft.

FMI: www.boeing.com/defense-space/support/maintenance/c130/index.html

Advertisement

More News

RFP: ANN Seeking New Site/Facility For Major Studio Upgrade

It's Official: Aggressive Upgrades For New Airborne Programs WILL Require New Digs It's been in development for years, but we're getting to a point where we think we can pull off s>[...]

Airborne-Unmanned 08.22.17: Flightwave, Robotic Skies, Sky Hopper Cargo Drone

Also: Kratos Mako, Dronecode's Meier, Virginia Tech, Edwards AFB, Department Of The Interior A California-based startup company plans to introduce a new, long-range, high-endurance>[...]

AMA Drone Report 08.17.17: MULTI-GP Int'l Open, Drone v Chicago, Reno Drone Race

Also: Yuneec Extended Service Plan, UAV on A/C Carrier, Blue Angels Incident, Drone Operator Safety Act MultiGP’s 2017 MultiGP International Open, conducted on the grounds of>[...]

Airborne 08.23.17: ANN’s ‘Best SportPlanes', Zenith's Eclipse, KSMO 2023

Also: First US-Built A320, True Blue Power, Sonic Boom, Signature-CAF, Boeing Helena, USAF Combat Rescue, Atlantic Aviation This year’s selection of the best SportPlanes of 2>[...]

Airborne 08.22.17: Privatization $$$, A Hangar for Doc, Wingsuit Jet

Also: Next X-37B Mission, Aero-Calendar, Ryanair, Citation X, Aurora, Commercial Spaceflight Federation, A&P Designation ATC Privatization will be even costlier than thought...>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC