Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 07.31.14/Oshkosh Day 4! ** HD iPad-Friendly Version--Airborne 07.31.14/Oshkosh Day 4 **
** Airborne 07.30.14/Oshkosh Day 3! ** HD iPad-Friendly Version--Airborne 07.30.14/Oshkosh Day 3 **
** Airborne 07.29.14/Oshkosh Day 2! ** HD iPad-Friendly Version--Airborne 07.29.14/Oshkosh Day 2 **
** Airborne 07.28.14/Oshkosh Day 1! ** HD iPad-Friendly Version--Airborne 07.28.14/Oshkosh Day 1 **

Wed, Mar 30, 2005

Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test

Premier Aircraft, Honeywell Call For 2005 Certification

The recently announced performance upgrade from Premier Aircraft for the Dassault Falcon 50, called the Falcon 50-4, has passed its first engineering milestone: the integration test of the existing nacelle and new engine nozzle at Honeywell’s engine facilities in Phoenix, AZ.

The test results validate the engineering predictions for the first phase of the new nozzle development and verify the Honeywell estimates of thrust and thrust specific fuel consumption (TSFC) that support Premier’s performance estimates for the Falcon 50-4. The upgraded aircraft, powered by three TFE-731-4 engines, is expected to have longer range, increased hot-high performance (for significantly increased payloads), increased climb performance and higher cruise thrust, than the original-specification aircraft.

Premier Aircraft and Honeywell plan further investigation of nozzle designs to determine if further revisions in nozzle configuration will produce additional performance benefits for the Falcon 50-4.

Premier Aircraft will begin certification of the Falcon 50-4 Performance Upgrade upon obtaining a minimum of ten customers. Jim Swehla, Premier Aircraft president, reports brisk sales activity since the announcement of the Falcon 50-4 program at the 2004 Convention of the National Business Aviation Association, with over 20 qualified inquiries identified in the last two months. Premier says it's offering incentives to its first ten customers and expects the STC effort to commence on schedule during the first quarter of 2005, with award of the STC planned for fourth quarter 2005.

Price of the performance upgrade is $2.305 million, but may be much less for customers enrolled on MSP. In addition, a special MSP rate and engine warranty is provided with the upgrade, as is an extended CZI interval.

FMI: www.premierair.com

Advertisement

More News

ICON Aircraft Constructs And Flies First Production A5

ESN-1 Was Built From The Production Design, Tooling After years of waiting... and doubting... ICON Aircraft has unveiled what it says is the first production A5, an aircraft the co>[...]

Airborne 07.30.14: WomenVenture 2014, Skycraft Update, IMC Club Award

Also: AvNav EFB, Lockheed Martin, One Week Wonder Update, Pelton Intvw-Part3 It was hard to miss the energy, enthusiasm, and interest in aviation by hundreds of women celebrating a>[...]

EAA Holds Annual Meeting

Membership Feels Flight Path Still On The Center Line EAA held its annual membership meeting on Wednesday, at 08:30 on 30 July 2014 at Oshkosh, WI. in the Theater of the Woods. In >[...]

Historic OSH2014 Sponsor: Bendix-King by Honeywell

OSH2014 Sponsor: Bendix-King by Honeywell The history of the Bendix name runs parallel to the development of King Radio until the mid-1980s, when the Allied Corporation purchased B>[...]

Life-Saving OSH2014 Sponsor: BRS Parachutes

BRS Parachutes: Defining Aviation Safety It's a simple idea, really. A parachute which will, when deployed, turn what could be a very bad situation into one in which not only the o>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC