Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 02.08.16

Airborne 02.09.16

Airborne 02.10.16

Airborne 02.11.16

Airborne 02.12.16

Airborne Hi-Def On YouTube

Airborne 02.08.16

Airborne 02.09.16

Airborne 02.10.16

Airborne 02.11.16

Airborne 02.12.16

Wed, Mar 30, 2005

Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test

Premier Aircraft, Honeywell Call For 2005 Certification

The recently announced performance upgrade from Premier Aircraft for the Dassault Falcon 50, called the Falcon 50-4, has passed its first engineering milestone: the integration test of the existing nacelle and new engine nozzle at Honeywell’s engine facilities in Phoenix, AZ.

The test results validate the engineering predictions for the first phase of the new nozzle development and verify the Honeywell estimates of thrust and thrust specific fuel consumption (TSFC) that support Premier’s performance estimates for the Falcon 50-4. The upgraded aircraft, powered by three TFE-731-4 engines, is expected to have longer range, increased hot-high performance (for significantly increased payloads), increased climb performance and higher cruise thrust, than the original-specification aircraft.

Premier Aircraft and Honeywell plan further investigation of nozzle designs to determine if further revisions in nozzle configuration will produce additional performance benefits for the Falcon 50-4.

Premier Aircraft will begin certification of the Falcon 50-4 Performance Upgrade upon obtaining a minimum of ten customers. Jim Swehla, Premier Aircraft president, reports brisk sales activity since the announcement of the Falcon 50-4 program at the 2004 Convention of the National Business Aviation Association, with over 20 qualified inquiries identified in the last two months. Premier says it's offering incentives to its first ten customers and expects the STC effort to commence on schedule during the first quarter of 2005, with award of the STC planned for fourth quarter 2005.

Price of the performance upgrade is $2.305 million, but may be much less for customers enrolled on MSP. In addition, a special MSP rate and engine warranty is provided with the upgrade, as is an extended CZI interval.

FMI: www.premierair.com

Advertisement

More News

Airborne 02.12.16: NEW Mooney!, Not-So-Good GAMA Stats, DA40 Upgrades

Also: A350-1000 Final Assembly, Barnstorming: ATC Privatization, Lithium Issue, Boeing Cuts, Tillamook C-27, Sywell Aerodrome, Massive Airship Mooney International Corporation unve>[...]

Aero-News: Quote Of The Day (02.14.16)

Aero-News Quote of the Day “Business travel to and within Europe continues to show its resiliency. The fact is that we’ve reached a new normal in managing risk, and bus>[...]

ANN's Daily Aero-Term (02.14.16): Braking Action Advisories

Braking Action Advisories When tower controllers have received runway braking action reports which include the terms “fair,” “poor,” or “nil,” o>[...]

ANN's Daily Aero-Linx (02.14.16)

Aero Linx: Army Aviation Association of America AAAA stands for Army Aviation Association of America. The mission of the AAAA is to support the United States Army Aviation Soldier >[...]

Business Travel 'Largely Unaffected' By Attacks In Paris

GBTA Polls Show Increased Business Travel Resiliency Following Terrorist Attacks More than 90 percent of U.S. and European business travel buyers now report that their company&rsqu>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC