Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 05.14.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.14.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Wed, Mar 30, 2005

Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test

Premier Aircraft, Honeywell Call For 2005 Certification

The recently announced performance upgrade from Premier Aircraft for the Dassault Falcon 50, called the Falcon 50-4, has passed its first engineering milestone: the integration test of the existing nacelle and new engine nozzle at Honeywell’s engine facilities in Phoenix, AZ.

The test results validate the engineering predictions for the first phase of the new nozzle development and verify the Honeywell estimates of thrust and thrust specific fuel consumption (TSFC) that support Premier’s performance estimates for the Falcon 50-4. The upgraded aircraft, powered by three TFE-731-4 engines, is expected to have longer range, increased hot-high performance (for significantly increased payloads), increased climb performance and higher cruise thrust, than the original-specification aircraft.

Premier Aircraft and Honeywell plan further investigation of nozzle designs to determine if further revisions in nozzle configuration will produce additional performance benefits for the Falcon 50-4.

Premier Aircraft will begin certification of the Falcon 50-4 Performance Upgrade upon obtaining a minimum of ten customers. Jim Swehla, Premier Aircraft president, reports brisk sales activity since the announcement of the Falcon 50-4 program at the 2004 Convention of the National Business Aviation Association, with over 20 qualified inquiries identified in the last two months. Premier says it's offering incentives to its first ten customers and expects the STC effort to commence on schedule during the first quarter of 2005, with award of the STC planned for fourth quarter 2005.

Price of the performance upgrade is $2.305 million, but may be much less for customers enrolled on MSP. In addition, a special MSP rate and engine warranty is provided with the upgrade, as is an extended CZI interval.

FMI: www.premierair.com

Advertisement

More News

ANN's Daily Aero-Linx (05.18.13)

Fun Places To Fly All gassed up and no place to go? "Fun Places To Fly" has an ever growing list of Aviation Events and Fun Places to Fly, provided by pilots like you who love avia>[...]

ANN's Daily Aero-Term (05.18.13): Differential Ailerons

Control surface rigged such that the aileron moving up moves a greater distance than the aileron moving down. The up aileron produces extra parasite drag to compensate for the addi>[...]

Aero-News: Quote Of The Day (05.18.13)

"While the IRS will complete open audits, management companies can be secure in the fact that while additional guidance is developed, they will not face potentially crippling tax a>[...]

ANN FAQ: It's Alive! ANN REALTIME NewsBug Headlines for YOUR Desktop!

It's For Real! ANN REALTIME NewsBug Released To ANN Readers, Worldwide For those of you using a windows PC (MAC version in the works... we promise), a new REALTIME News Service fro>[...]

Online Fundraising Campaign Underway To Restore SF Fleet Week Air Show

Crowdfunding Effort Has A Goal Of $800,000 Online fundraising efforts called "Crowdfunding" are all the rage these days, with entrepreneurs using the campaigns to raise money to es>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC