Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 07.23.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.23.14 **
** Airborne 07.21.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.21.14 **
** Airborne 07.18.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.18.14 **

Wed, Mar 30, 2005

Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test

Premier Aircraft, Honeywell Call For 2005 Certification

The recently announced performance upgrade from Premier Aircraft for the Dassault Falcon 50, called the Falcon 50-4, has passed its first engineering milestone: the integration test of the existing nacelle and new engine nozzle at Honeywell’s engine facilities in Phoenix, AZ.

The test results validate the engineering predictions for the first phase of the new nozzle development and verify the Honeywell estimates of thrust and thrust specific fuel consumption (TSFC) that support Premier’s performance estimates for the Falcon 50-4. The upgraded aircraft, powered by three TFE-731-4 engines, is expected to have longer range, increased hot-high performance (for significantly increased payloads), increased climb performance and higher cruise thrust, than the original-specification aircraft.

Premier Aircraft and Honeywell plan further investigation of nozzle designs to determine if further revisions in nozzle configuration will produce additional performance benefits for the Falcon 50-4.

Premier Aircraft will begin certification of the Falcon 50-4 Performance Upgrade upon obtaining a minimum of ten customers. Jim Swehla, Premier Aircraft president, reports brisk sales activity since the announcement of the Falcon 50-4 program at the 2004 Convention of the National Business Aviation Association, with over 20 qualified inquiries identified in the last two months. Premier says it's offering incentives to its first ten customers and expects the STC effort to commence on schedule during the first quarter of 2005, with award of the STC planned for fourth quarter 2005.

Price of the performance upgrade is $2.305 million, but may be much less for customers enrolled on MSP. In addition, a special MSP rate and engine warranty is provided with the upgrade, as is an extended CZI interval.

FMI: www.premierair.com

Advertisement

More News

Trig Avionics Announces New ADS-B Out Solution

TN70 WAAS GPS Receiver Optimized For Use With Other Trig Avionics Trig Avionics is introducing its new TN70 WAAS GPS with companion Antenna, optimized for use with Trig products.>[...]

ANN's Daily Aero-Linx (07.25.14)

Aviation Digital Data Service The Aviation Digital Data Service (ADDS) makes available to the aviation community text, digital and graphical forecasts, analyses, and observations o>[...]

ANN's Daily Aero-Term (07.25.14): Pitch Point

A fix/waypoint that serves as a transition point from a departure procedure or the low altitude ground-based navigation structure into the high altitude waypoint system.>[...]

Aero-News: Quote Of The Day (07.25.14)

"The final rule is now planned for, I think its December of 2017. That is later than the statute, which calls for a final rule by the end of 2015." Source: FAA's Associate Administ>[...]

ANN FAQ: Disqus

A Powerful New Tool For You To Use For Your Aero-Conversations Want to start a conversation about a story you've seen on Aero-News? It's even easier with Disqus, a powerful, web-ba>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC