Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Wed, Mar 30, 2005

Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test

Premier Aircraft, Honeywell Call For 2005 Certification

The recently announced performance upgrade from Premier Aircraft for the Dassault Falcon 50, called the Falcon 50-4, has passed its first engineering milestone: the integration test of the existing nacelle and new engine nozzle at Honeywell’s engine facilities in Phoenix, AZ.

The test results validate the engineering predictions for the first phase of the new nozzle development and verify the Honeywell estimates of thrust and thrust specific fuel consumption (TSFC) that support Premier’s performance estimates for the Falcon 50-4. The upgraded aircraft, powered by three TFE-731-4 engines, is expected to have longer range, increased hot-high performance (for significantly increased payloads), increased climb performance and higher cruise thrust, than the original-specification aircraft.

Premier Aircraft and Honeywell plan further investigation of nozzle designs to determine if further revisions in nozzle configuration will produce additional performance benefits for the Falcon 50-4.

Premier Aircraft will begin certification of the Falcon 50-4 Performance Upgrade upon obtaining a minimum of ten customers. Jim Swehla, Premier Aircraft president, reports brisk sales activity since the announcement of the Falcon 50-4 program at the 2004 Convention of the National Business Aviation Association, with over 20 qualified inquiries identified in the last two months. Premier says it's offering incentives to its first ten customers and expects the STC effort to commence on schedule during the first quarter of 2005, with award of the STC planned for fourth quarter 2005.

Price of the performance upgrade is $2.305 million, but may be much less for customers enrolled on MSP. In addition, a special MSP rate and engine warranty is provided with the upgrade, as is an extended CZI interval.

FMI: www.premierair.com

Advertisement

More News

Airborne At OSH15 Day 5 Redux: Inhofe's Mission, NextGen GA Fund, New Kitfox

Also: Cicare 8, Switchblade Update, Beringer Alaskan Bush Gear, Jack Pelton Interview - Final E-I-C Note: Regularly Daily Airborne Unlimited Programming will resume this Monday now>[...]

ANN's Daily Aero-Linx (08.01.15)

The BD-5 Web Site The official home of the BD-5 network, the purpose of this web site is to provide information about the Bede Aircraft BD-5, an experimental, homebuilt, single-sea>[...]

ANN's Daily Aero-Term (08.01.15): Notice To Airmen (NOTAM)

A notice containing information (not known sufficiently in advance to publicize by other means) concerning the establishment, condition, or change in any component (facility, servi>[...]

Aero-News: Quote Of The Day (08.01.15)

"The fairing separation is one of our very first critical events. If it doesn't work as planned, it's probable the mission cannot continue." Source: Mike Hawes, Lockheed Martin Ori>[...]

ANN FAQ: Aero-Twitters Offer Instant Alerts For Breaking News

Say Hello To Aero-Twitter! Twitter is designed to work on a mobile phone as well as on a computer (and can be accessed via your IM clients). All Twitter messages (called "Tweets", >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC