Atlantis Docks With ISS; Now The Work Begins | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 06.22.17

Airborne 06.19.17

Airborne 06.20.17

Airborne 06.21.17

Airborne 06.22.17

Airborne 06.23.17

Airborne-Unmanned 06.20.17

Airborne-YouTube

AMA 06.22.17

Airborne 06.19.17

Airborne 06.20.17

Airborne 06.21.17

Airborne 06.22.17

Airborne 06.23.17

Airborne-Unmanned 06.20.17

XPONENTIAL Innovation Preview -- www.allthingsunmanned.com

Mon, Sep 11, 2006

Atlantis Docks With ISS; Now The Work Begins

No Fumbling As Shuttle Arm Hands Off Truss To Station Arm

Astronauts aboard the International Space Station and the shuttle Atlantis are wasting no time in going about their tasks for the 12-day construction mission -- as shortly after docking with the ISS Monday morning, the shuttle's robotic arm handed off the P3/P4 integrated truss structure to its counterpart on the International Space Station.

The orbital exchange took place at 10:52 am EDT -- a bit over four hours after Atlantis docked with the station -- and sets the stage for installation of the truss on the station on Tuesday.

Lead STS-115 Flight Director Paul Dye said rendezvous and docking operations went smoothly.

"The rendezvous this morning was probably as perfect as any rendezvous that I have been a part of," Dye said.

The truss structure, which is 17.5 tons and 45 feet long, contains a set of solar arrays. The STS-115 crew will conduct three spacewalks to outfit and prepare the truss for operation. The first spacewalk will take place Tuesday after the P3/P4 is attached to the P1 truss.

In preparation for the first spacewalk, Mission Specialists Joe Tanner and Heidemarie Stefanyshyn-Piper will begin a new pre-spacewalk procedure called "camping out" when they enter the station’s Quest Airlock at about 2:40 pm Monday afternoon.

"Camping  out" helps the spacewalkers begin the spacewalk earlier, by reducing the amount of time typically required for the pre-breathe exercise and some spacewalk preparations. By breathing a pure oxygen environment for 24 hours before their spacewalk, the two mission specialists will be able to focus on preparation tasks immediately ahead of their planned spacewalk Tuesday.

Meanwhile, NASA engineers will analyze photographs taken of the orbiter's heat shield during Atlantis' "backflip" manuever (shown above) ahead of docking with the station. So far, it appears all is well with the orbiter.

FMI: www.nasa.gov

Advertisement

More News

AMA Drone Report 06.22.17: FAA Reauthorization, Rotor Riot Int'l, DRL on ESPN

Also: Drones at Oshkosh!, Drone Regulatory Effort, AMA Drone Report-Help Wanted, Aero-TV: MultiGP Drone Racing The House of Representatives has published initial language to reauth>[...]

Airborne-Unmanned 06.20.17: UAS Orgs v Bad Regs, Anti-Collision, Drone Race $$

Also: Solar-Powered UAS, NK Drone, UAS Survey, Brian Wynne Interview The team at AUVSI is staying plenty busy as they and 13 other organizations authored a letter to members of Con>[...]

Airborne 06.23.17: Airbus 'Racer', RANS 'Fly To Work', Boater v Floatplane

Also: House ATC Bill, Golda Cox, Boeing Forecast, Concorde Battery, C-130J-SOF, SpiceJet, Flt School Closure Airbus Helicopters has unveiled their ‘Racer’ -- which stan>[...]

Aero-News: Quote of the Day (06.25.17)

“The airline market in Africa has been growing slowly but steadily as the industry is becoming more liberalized and the infrastructure to support the growth is being put in p>[...]

ANN's Daily Aero-Term (06.25.17): Control Sector

Control Sector An airspace area of defined horizontal and vertical dimensions for which a controller or group of controllers has air traffic control responsibility, normally within>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC