Third MC-21-300 Aircraft Joins The Flight Test Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Mar 20, 2019

Third MC-21-300 Aircraft Joins The Flight Test Program

Flight Lasted One Hour, 30 Minutes In 'Normal Mode'

On March 16, 2019, the first flight of the third MC-21-300 test aircraft took place at the airfield of Irkutsk Aviation Plant, the affiliate of Irkut Corporation (a UAC member).

The duration of flight was 1 hour 30 minutes at an altitude of 11,500 feet and a speed of up to 253 knots. The plane was piloted by the crew of Andrey Voropayev and Roman Taskaev test pilots. According to the crew report, the task was performed completely, the flight was in normal mode.

"MC-21-300 flight tests are continuing. Today the third aircraft joined to them. On this plane, in addition to special testing equipment, a passenger cabin is installed," said Denis Manturov, Minister of Industry and Trade of the Russian Federation.

According to Minister of Industry and Trade Denis Manturov, it was decided to hold the premiere public debut of the MC-21-300 aircraft with a passenger interior at the Moscow international aviation and space salon MAKS-2019. “This will allow us to visually demonstrate to potential customers and future passengers one of the most important competitive advantages of the Russian airliner - an increased level of comfort,” Manturov said.

Yuri Slyusar, president of UAC and Irkut Corporation, added that in 2019 the fourth MC-21-300 prototype, built at the Irkutsk Aviation Plant, will join the flight tests. “Airplanes are built on new automated lines that provide high precision and quality of assembly,” Slyusar said.

(Image provided with Irkut Corporation news release)

FMI: www.uacrussia.ru

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC