Utilicraft Aerospace Industries, M7 Aerospace Sign Agreement | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Sep 19, 2007

Utilicraft Aerospace Industries, M7 Aerospace Sign Agreement

Firms Will Work To Develop FF-1080 Freighter Prototype

Utilicraft Aerospace Industries of Albuquerque, NM tells ANN it has contracted with M7 Aerospace LP for the design and development of the pre-production prototype wing and powerplant installation for Utilicraft's fledgling FF-1080 Freight Feeder aircraft. 

The FF-1080-200 is a high-wing, twin-engine turboprop aircraft designed to carry eight fully loaded LD3 cargo containers for a distance of 500 nautical miles. Lighter loads can be carried distances up to 2,000 nautical miles, although the aircraft is primarily intended for use in the short haul feeder role for large volume package carriers.

M7's Engineering Division has begun designing attachments and interface of the Pratt & Whitney PW-127G engines and nacelles to the existing prototype wing center section. Fuselage design and tooling is underway at Utilicraft and Metalcraft Technologies Inc.

Utilicraft currently has orders and options for 25 FF-1080-200s. The aircraft is designed to have short takeoff and landing (STOL) capability, to operate from airfields with less than 3,500 feet of available runway.

"We are pleased to be associated with the development of this exciting new product that brings so much value to the air cargo industry," said Joe Furnish, vice president of M7's Engineering Division. 

M7's Engineering Division provides a wide variety of engineering services to M7 Aerospace, its customers, and other organizations or individuals requiring design, analysis or test procedures.

M7's engineering team has certified aircraft and systems to requirements of the US Federal Aviation Administration, the European Aviation Safety Agency (EASA), and other foreign certification agencies, spanning the requirements of FAR 23, 25, 27, 29 and their European equivalents.  The team is familiar with both fixed- and rotary-wing aircraft.

Utilicraft plans to have the FF-1080 certified to FAA Part 25 requirements.

FMI: www.m7aerospace.com, www.utilicraft.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC