Bombardier Consolidating Manufacturing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Wed, Oct 22, 2003

Bombardier Consolidating Manufacturing

US Jobs Will Go; Canadian Headcount Won't Increase

Bombardier Aerospace has announced plans to create integrated manufacturing centres for its Bombardier Learjet and Challenger Series business jets at its Wichita (KS) and Dorval, Quebec locations respectively.

The new business aircraft manufacturing centers will regroup business aircraft final line activities and interior completions at one site. By combining these two activities in one location, Bombardier Aerospace will significantly reduce its production cycle times and inventory levels while improving its competitiveness. Production of Bombardier regional aircraft currently follows the integrated manufacturing centre model.

The creation of the two business aircraft integrated manufacturing centers will result in total net savings of $33 million Cdn annually ($25 million US) starting with the first full year of operation. The integrated manufacturing centers will be fully operational by the first quarter of 2005.

Additional benefits of the integrated manufacturing centers include:
  • A centralized expertise around the same product lines, which will enable Bombardier Aerospace to be more efficient in its manufacturing activities and to better focus and respond to its customers' needs with a more streamlined and flexible organizational structure.
  • The proximity to its supplier base, which will facilitate suppliers' 'just in time' integration into production activities and help achieve the full potential of cost reduction initiatives for the acquisition of aircraft components.
  • A reduction in the number of sites required for production activities, which will make available manufacturing space for other business units.
  • The creation of these integrated manufacturing centers will result in the relocation of manufacturing activities and a reduction in employment levels. Estimated severance costs related to the reduction in employment levels will be approximately $8 million US.
Tucson Jobs Hit Hardest; New Positions There, Later

In Tucson (AZ), a reduction of approximately 800 jobs over the next 15 to 18 months will take place as a result of the transfer of Bombardier Learjet interior completions to Wichita and Bombardier Challenger interior completions to Dorval. Some of the employees affected will have the opportunity to relocate to fill jobs in Wichita and Montreal.

In addition, Tucson has been selected as the location for the western Bombardier Regional Aircraft Service Centre, which will result in the creation of approximately 300 new jobs over a three-year period. The Bombardier Business Aviation Services Centre will continue to operate at the site, adjacent to Tucson International Airport.

In Wichita, there will be an overall workforce reduction of approximately 350 positions over the next 12 to 15 months. The increase in the number of employees due to the transfer of Bombardier Learjet completions from Tucson to Wichita will be offset by a reduction in the workforce as the assembly process of the Bombardier Challenger 300 is moved to Dorval.

In Dorval, there will be no immediate increase in the level of employment resulting from the transfer of the Bombardier Challenger 300 assembly line from Wichita and Bombardier Challenger 300 and Challenger 604 interior completions from Tucson.

"An integrated assembly and completion process is a significant competitive advantage in our industry," said Pierre Beaudoin, president and chief operating officer, Bombardier Aerospace. "These new integrated manufacturing centers will ensure our long-term success by maximizing synergies in our business aircraft production operations, resulting in significant cost savings and increased efficiency. We are dedicated to industry leadership in the regional and business aircraft markets. This integrated manufacturing strategy will simplify our processes and make it simpler for our customers to do business with us."

FMI: schedule

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC