Air Force Establishes F-35 Initial Operational Capability Target | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Tue, Jun 04, 2013

Air Force Establishes F-35 Initial Operational Capability Target

Says The Aircraft Will Be Operational In December, 2016

The U.S. Air Force says it expects to declare F-35A Lightning II initial operation capability in December 2016. The announcement was included in a joint report detailing service-specific IOC requirements and dates for each of the F-35 variants that was delivered to Congress last week.

"The Air Force has spent the last six months looking at our initial capability requirements and the expected availability date. This announcement is exciting news for the Air Force," said Secretary of the Air Force Michael Donley. "It highlights to members of Congress, our international partners, and the American public that the program is on track to bring the United States military and our allies this critical capability."

Congress directed the secretary of the Air Force and secretary of the Navy to provide a report that details the IOC dates, requirements and capabilities for each of the F-35 variants by June 1.
 
The Air Force will achieve IOC when the first operational squadron has 12 or more aircraft and Airmen are trained and equipped to conduct basic close air support, interdiction, and limited suppression and destruction of enemy air defense operations in a contested environment.
 
"The F-35 is a vital capability that the nation needs to stay ahead of adversary technological gains, and it provides the multi-role capabilities that the anti-access and area denial environment of the future will require," said Air Force Chief of Staff Gen. Mark A. Welsh III. "We're excited that this program is on the road to success, and we're grateful that our international partners remain as committed to this program as we are."
 
The airplane has achieved a string of milestones recently as it moves toward IOC. A few of these include the beginning of pilot training at Eglin Air Force Base, FL, in January; the delivery of the first operational test aircraft to Edwards AFB, CA, and Nellis AFB, NV, in March; the first operational pilot aerial refueling in April; and the completion of high angle of attack testing in May.

(USAF file image)

FMI: www.af.mil

 


Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC