AD: Pratt & Whitney Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Oct 30, 2019

AD: Pratt & Whitney Turbofan Engines

AD NUMBER: 2019-21-11

PRODUCT: Certain Pratt & Whitney (PW) PW1519G, PW1521G, PW1521GA, PW1524G, PW1525G, PW1521G-3, PW1524G3, PW1525G-3, PW1919G, PW1921G, PW1922G, PW1923G, and PW1923G-A model turbofan engines.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2019-19-11 for the products listed above.

AD 2019-19-11 required initial and repetitive inspections of the low-pressure compressor (LPC) inlet guide vane (IGV) and the LPC rotor 1 (R1) and, depending on the results of the inspections, possible replacement of the LPC.

This AD requires the same inspection of the LPC R1 for cracks or damage, removes the inspection of the LPC IGV for proper alignment, and expands the applicability to certain additional PW turbofan engines.

This AD also reduces the compliance time for these inspections for certain PW turbofan engines.

This AD was prompted by recent findings of cracks in the LPC R1 and an additional in-flight failure of the LPC R1.

DATES: This AD is effective October 29, 2019. The FAA must receive any comments on this AD by December 13, 2019.

COST: The FAA estimates that this AD affects 18 engines installed on airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Borescope inspection per inspection cycle: 2 work-hours × $85 per hour = $170 per engine.

On-Condition costs:

  • Replace LPC: Labor: 40 work-hours × $85 per hour = $3,400 per engine. Parts: $156,000, Cost per engine: $159,400.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC