Integration Begins For Airbus’ Next-Generation Beluga XL | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 08.17.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.17.17

Airborne 08.18.17

Airborne-Unmanned 08.15.17

Airborne-YouTube

AMA 08.17.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.17.17

Airborne 08.18.17

Airborne-Unmanned 08.15.17

NEW!!! 2017 AirVenture Innovation Preview -- YouTube Presentation / Vimeo Presentation

Wed, Jan 11, 2017

Integration Begins For Airbus’ Next-Generation Beluga XL

Process Expected To Take 18 Months

Airbus’ next-generation oversize cargo airlifter is transitioning from concept to reality as the first Beluga XL core airframe starts its 18-month integration process at the company’s production facilities in Toulouse, France.

The core airframe is an extract of an Airbus A330-200 freighter that already has been structurally reinforced, providing the platform on which the Beluga XL airframe will be built. This element was assembled in December without a nose fuselage or tail assembly – both of which will be added during activity planned in 2017.

Integration of the Beluga XL core airframe will be performed inside the two-section L34 building at Airbus’ Lagardère industrial zone, which is adjacent to Toulouse-Blagnac Airport.

For the first 12 months of the assembly activity, the airframe will be completed and its mechanical and electrical systems will be fitted at an integration station. For the remaining six months, the aircraft will move to a second station for ground testing and engine installation.

“The coming year of final integration will be a series of small steps,” said Beluga XL program head Bertrand George. “The number of holes to be drilled and fasteners to be installed is far bigger than on any other Airbus aircraft. Sticking to schedule at each step is the key to being ready for first flight in 2018. I fully trust the capability of our teams to make it happen together.”

Based on the airframe of the versatile A330 jetliner, a total of five Beluga XL airlifters are to be built, with the first to enter operational service in 2019. They will gradually replace the existing fleet of Beluga ST aircraft, which were derived from the shorter-fuselage A300.

Once the first Beluga XL enters service, it will provide crucial support to Airbus’ production ramp-up from day one thanks to its ability to carry a full set of A350 XWB wings.

(Image provided with Airbus news release)

FMI: www.airbus.com

Advertisement

More News

AMA Drone Report 08.17.17: MULTI-GP Int'l Open, Drone v Chicago, Reno Drone Race

Also: Yuneec Extended Service Plan, UAV on A/C Carrier, Blue Angels Incident, Drone Operator Safety Act MultiGP’s 2017 MultiGP International Open, conducted on the grounds of>[...]

Airborne 08.18.17: NBAA v KSMO, Sully Attacked, DB Cooper Update

Also: New NASA Admin?, Anti-Aviation Hypocrites, Airberlin, Sky Hopper, Drone v Carrier, Jet Aviation, Airman Retires The NBAA joined five other stakeholders to file a brief with t>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

RFP: ANN Seeking New Site/Facility For Major Studio Upgrade

It's Official: Aggressive Upgrades For New Airborne Programs WILL Require New Digs It's been in development for years, but we're getting to a point where we think we can pull off s>[...]

Airborne-Unmanned 08.15.17: Reno Drone Races, DoD CrackDown, Blue Angels v UAV?

Also: Kansas DOT-AirMap, CIRRUAS Drone Program, Daytona Beach PD UAS, Virginia UAS SAR The Reno Air Racing Association has signed an agreement with the MultiGP Drone Racing League >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC