GAMA Marks Over 40,000 Aircraft Equipped With ADS-B | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Sep 19, 2017

GAMA Marks Over 40,000 Aircraft Equipped With ADS-B

Numbers Reflect Equipage Data As Of September 1

GAMA reports that as of September 1, rule-compliant Automatic Dependent Surveillance-Broadcast (ADS-B) equipment is now on board over 40,000 aircraft flying in the United States.

Air traffic control system modernization activities are accelerating worldwide. It is vital that aircraft owners begin to make informed decisions about how to comply with emerging and existing regulatory mandates by selecting the right equipment for their aircraft’s typical mission. The FAA has estimated that 100,000 to 160,000 general aviation aircraft will need to be equipped with ADS-B Out before the January 1, 2020, mandate.

“We’re now just over two years out from the FAA compliance deadline,” said GAMA President and CEO Pete Bunce. “As we move forward, knowing that date will not change, it is essential that those operators who haven’t yet, make a plan for equipage to avoid having their aircraft grounded and losing its residual value.”

Since the FAA announced the mandate, general aviation manufacturers have worked hard to design, develop, certify and make available ADS-B products that enhance safety for operators at a reasonable cost. Some solutions for light general aviation aircraft are available for a range from $1,200 to $4,000, each providing significant safety benefits when presented on an ADS-B IN capable display. The FAA is also offering a $500 rebate to offset an owner’s cost on an eligible aircraft until midnight tonight.

“By choosing to equip now, operators are investing in their safety and ensuring they meet the 2020 deadline before installation lines grow long,” added Bunce. “We are very pleased with the continuous growth in equipage, and manufacturers will continue working with the FAA and operators to facilitate equipage as the deadline approaches.”

(Source: GAMA news release. Image from file)

FMI: www.gama.aero

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC