Aero-TV Check Out Oshkosh's New 'Cab With A View' | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Sep 05, 2008

Aero-TV Check Out Oshkosh's New 'Cab With A View'

Join Us As The New $6.3M OSH Control Tower Is Dedicated

Near the close of this year's 2008 rendition of the annual Oshkosh aerial extravaganza, a new Oshkosh control tower was dedicated, and done so in the presence of a plethora of federal and local officials.

After some opening remarks by Great Lakes Regional Administrator Barry Cooper, both EAA President Tom Poberezny and FAA Acting Administrator Robert Sturgell spoke of the beautiful new facility and the commanding view from the top. Mark Harris, Winnebago County Executive, thanked the FAA for funding the tower and remarked how happy the citizens of Winnebago County are to have a new facility with no additional taxes.

A plaque was presented to Lake Hub Manager -- and, during AirVenture, Oshkosh Tower Manager -- Wanda Adelman, dedicating it as of August 1, and the ribbon was cut in commemoration of the event.

The new control tower is 141 feet tall with a base building of 8827 square feet made of precast concrete walls. Designed by Omni Associates of Appleton, WI with the general contractors Miron Construction Company of Neenah, Wisconsin, it is a state-of-the-art facility that makes the old tower seem small, decrepit, and outdated by comparison. With a construction cost of about $4 million, the total price tag including equipment and furnishings is roughly $6.3 million. The money was provided to the state by a block grant from the FAA, which is then passed on to the county to pay the contractors.

Originally planned to be located in the Fly Market area, the new location to the southeast was selected by computer-generated siting, accomplished in the labs of the FAA Technical Center, Atlantic City, NJ. The people flow through the tower cab and the increased space makes for a much more efficient operation, especially during AirVenture when it's normal to have 12 people in the cab at any time.

The conference room in the base building allows for the pre- and post-shift briefings between the FAA and EAA flightline personnel. It is a very functional and modern facility, that will be used for many years, and serve as an iconic landmark to all things Oshkosh.

Aero-TV Takes A Tour Of The Recently Dedicated Oshkosh Tower

FMI: www.faa.gov, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC