Lockheed Martin Wins Contract For P-3 Outer Wing Sets | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne On ANN

ADR 01.23.17

Airborne 01.23.17

Airborne 01.24.17

Airborne 01.18.17

Airborne 01.19.17

Airborne 01.20.17

Airborne Hi-Def On YouTube

ADR 01.23.17

Airborne 01.23.17

Airborne 01.24.17

Airborne 01.18.17

Airborne 01.19.17

Airborne 01.20.17

Thu, Sep 04, 2008

Lockheed Martin Wins Contract For P-3 Outer Wing Sets

First Deliveries Expected In 2010

It's a significant -- and needed -- advance for an aging workhorse. Lockheed Martin announced Thursday it has won a $129.3 million contract to build a total of 13 new outer wing sets for the US Navy's fleet of venerable P-3 Orion reconnaissance planes. The all new production outer wings will be delivered to the Navy beginning in early 2010 for installation on selected aircraft.

"Lockheed Martin has a long, proud history of providing P-3 sustainment and support to the US Navy," said Ray Burick, Lockheed Martin vice president of P-3/S-3 programs. "This new wing order is the next step in that partnership."

Lockheed Martin's P-3 wing production line opened in March 2008 and is the cornerstone of the company's P-3 Aircraft Service Life Extension Program (ASLEP). Lockheed Martin currently has the Royal Norwegian Air Force and the US Customs and Border Protection Service under contract for P-3 Life Extension Kits, and has submitted a response to the Canadian Forces under a Request For Proposal. A proposal for the Taiwan P-3 fleet is also in work.

"As the P-3 Orion original equipment manufacturer, Lockheed Martin is uniquely qualified to sustain and support the world's P-3 leets," said Burick. "Aside from the operators of these aircraft, nobody knows the P-3 better than Lockheed Martin."

The complete ASLEP solution replaces the aircraft outer wings, center wing lower section and horizontal stabilizers with new production components. All fatigue-life limiting structures on the aircraft are replaced with enhanced-design components and improved corrosion-resistant materials that will greatly reduce maintenance costs over the aircraft's service life.

"Lockheed Martin is committed to providing a range of solutions that enables operational effectiveness for P-3 Orion operators worldwide for decades to come," said Burick. "We're fully prepared to support the US Navy and all our customers in their future maritime surveillance activities."

The Boeing P-8A Poseidon, expected to replace the Orions, isn't expected to enter service until 2013. The Navy will receive its first of five test P-8As in 2009.

FMI: www.lmco.com, www.navy.com

Advertisement

More News

AMA Drone Report 01.23.17: AMA Expo West, Propel Star Wars Drones, Lily Folds

Also: Ready Made RC FPV Fest, ERAU Offering Drone Course, Second Drone Advisory Committee Meeting AMA Expo West was quite a transition for the ANN crew... who went from the insanit>[...]

Aero-News: Quote of the Day (01.23.17)

Aero-News Quote of the Day “The B-17F Memphis Belle is an icon that represents the thousands of bomber crews, maintainers, and others supporting the bomber mission, whose ser>[...]

Klyde Morris (01.23.17)

Klyde Bemoans The Highs and Lows Of A Change In Administrations FMI: www.klydemorris.com>[...]

Airborne 01.20.17: Astro-NIMBY!, Airbus Flying Car, JetSuiteX v KSMO

Also: Daher Delivers, Aviation Progress, Tecnam P2012, D.B. Cooper, MH370 Search, T-45C Accident, Piper We previously reported that studies indicate many complaints about airport n>[...]

AeroSports Update: Poberezny Estate To Be Preserved

Aircraft Spruce Acquires Poberezny Estate In Oshkosh, WI Anyone who is interested in recreational aviation is well aware of the impact Paul Poberezny and his family have made on fu>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC