Spaceport America Groundbreaking Postponed Until November | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jan 03, 2008

Spaceport America Groundbreaking Postponed Until November

EIS To Be Redone By Independent Contractor

A scrapped environmental impact statement has forced the groundbreaking for New Mexico's Spaceport America to be delayed to November 2008. But a spaceport official says the opening of the facility is still scheduled for early 2010, to coincide with anchor tenant Virgin Galactic's start of operations.

New Mexico Spaceport Authority Chairwoman Kelly O'Donnell told the Las Cruces (NM) Sun-News the FAA was concerned about a potential conflict of interest in the EIS, which was originally prepared by another state agency -- New Mexico State University's Physical Science Laboratory.

"In that transfer of data, there were some balls dropped, meaning that some of the work that had been done, had to be redone," O'Donnell said. California-based engineering firm Tetra Tech has since been contracted to perform the new EIS.

Groundbreaking was originally targeted for the first quarter of 2008. As ANN reported, designers unveiled sketches of the planned facility last year.

There have already been launches from the site by private companies, but most have not been announced in advance, to keep space buffs and competitors from learning and leaking trade secrets.

FMI: www.spaceportamerica.com, www.tetratech.com/portal/site/TetraTech/

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC