NASA Conducts Space Launch System Booster Separation Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Oct 28, 2014

NASA Conducts Space Launch System Booster Separation Testing

Simulation Brings Confidence For First Flight

Engineers at NASA’s Langley Research Center in Virginia are doing their part to enable NASA’s 5.5-million-pound SLS to launch the Orion spacecraft to deep space. To understand the aerodynamic forces exerted on the rocket as it flies through the atmosphere, Langley engineers recently tested a 35-inch SLS booster separation model in its Unitary Plan Wind Tunnel, with air speeds of over 2,400 mph. The engineers collected high-fidelity data from 800 runs.

Just over two minutes into the first flight of SLS, 16 booster separation motors will fire simultaneously and safely push the two solid rocket boosters away from the rocket’s core. As the core stage continues to travel at a speed greater than four times the speed of sound, the boosters reenter the Earth’s atmosphere and land in the Atlantic Ocean.

“Booster separation is a very critical phase of flight for the Space Launch System because the clearance between the core stage and the boosters is very small as they are pushed away,” said Langley engineer Jeremy Pinier. “It’s only about an inch full-scale so the boosters are almost grazing the core stage, but we can’t allow any contact whatsoever between the two in the real flight.”

The wind tunnel test, which validates an accurate clearance, was unlike any other. “It’s a pretty complex wind tunnel test,” Pinier said. “Usually we measure aerodynamic forces on a single model in the test section. Here we have three – the core and two solid rocket boosters – which makes it three times as difficult. We are also flowing very high pressure air through the booster separation motors, which is pretty unique, and an added challenge.”  

Due to the inherent complexity of the model design, test setup, tunnel operations and multi-dimensional parameter space, engineers spent four weeks installing the model into the tunnel prior to testing.

“We had to make sure we controlled exactly the positioning of the three bodies relative to each other,” Pinier explained. “At these small scales, we have to know within thousandths of an inch how well the model is positioned because when you translate it to a full scale distance, it immediately matters.”

With the successful completion of installation and testing of the SLS model, Pinier couldn’t help but reflect on how grateful he is for the opportunity.

“I have my dream job,” Pinier said with a big grin on his face. “Every day I drive through the NASA gate I know I’m helping to design the biggest rocket that has ever been built. It’s super exciting. Maybe one day I’ll even fly on this rocket, which would be even better.”

(Image provided by NASA)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC