Bell Helicopter Confirms Delay In Relentless Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Feb 01, 2017

Bell Helicopter Confirms Delay In Relentless Certification

Aircraft Have Been Grounded Since July 2016 Accident

Bell Helicopter has confirmed that there will be a delay in the certification of its 525 Relentless helicopter due to a fatal accident involving one of its test aircraft last July.

The company says that the two remaining flight test aircraft have been grounded since the accident pending the release of the NTSB's probable cause report. Two test pilots were fatally injured when the test aircraft went down on July 6, 2016. Bell has not even performed ground runs of the aircraft since the accident.

Larry Thimmesch, vice-president of 525 sales and business development said that the five-year certification window with the FAA expired late last year. That has been extended for two years, taking the program to the end of 2018.

Thimmesch said that Bell has made modifications to its two remaining flight test aircraft to facilitate the quick resumption of the flight test program once the NTSB has released its findings. He also said that Bell remains "very committed" to the Relentless program.

Another two aircraft are in final assembly, Thimmesch said, while the two existing aircraft are being upgraded to bring them to production-standard configuration.

(Image from file)

FMI: www.bellhelicopter.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC