Southwest Flying Planes Previously Grounded Due To Missed Inspections | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Feb 27, 2015

Southwest Flying Planes Previously Grounded Due To Missed Inspections

But Checks Must Be Completed Within Five Days

The clock is ticking on 128 Boeing 737 airliners flown by Southwest after it was revealed that they had missed inspections required by the FAA.

The planes had initially been grounded. Southwest said in a Tweet that "A select number of aircraft have been removed from service for maintenance checks, resulting in minimal delays."

The airline on Wednesday posted a statement on its website said that the FAA had approved a plan to complete inspections within five days.

"On Tuesday, Southwest Airlines discovered a required maintenance check on the standby hydraulic system, which serves as a back-up to the primary hydraulic systems, was overdue on 128 Boeing 737-700 aircraft," the statement said. "Southwest immediately and voluntarily removed the affected aircraft from service, initiated maintenance checks, disclosed the matter to the FAA, and developed an action plan to complete all overdue checks. Late Tuesday evening, the FAA granted Southwest approval to continue operating the aircraft for a maximum of five days as the checks are completed. Approximately 80 cancellations occurred Tuesday as Southwest awaited FAA's response."

"The Safety of Customers and Employees is Southwest's highest priority and the airline is working quickly to resolve the situation."

The airline said the flight schedule was expected to be nearly normal by Wednesday as the remaining checks were completed.

(Image from file)

FMI: www.southwest.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC