U.S. Army Orders 'Blimp In A Box' Sustainment Equipment | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Dec 02, 2013

U.S. Army Orders 'Blimp In A Box' Sustainment Equipment

Lighter Than Air Systems Equipment To Be Utilized In Training And Evaluation Exercises

Lighter Than Air Systems (LTAS), a wholly owned subsidiary of World Surveillance Group Inc. has received an order from prime defense contractor A-T Solutions, Inc. for sustainment equipment related to its "Blimp in a Box" aerostat systems ("BiB"). The BiB related components are to be delivered and installed in staged shipments beginning immediately and to be completed within 30 days. The sustainment equipment will be used to support the training and evaluation exercises taking place at the U.S. Army Garrison in Fort Polk, LA.

The two LTAS BiB aerostat systems currently in use at the Army's base at Fort Polk were delivered earlier this year under a contract award from the United States Department of Defense which included on-location support, installation and training for the BiB systems. The BiBs are intended to provide semi-persistent, mobile intelligence, surveillance, and reconnaissance ("ISR") at the platoon level. Each BiB system can provide low cost, mobile ISR for days, weeks or months with the aerostat system only requiring a rapid 15 minute recovery and re-launch helium top-off every 24-36 hours.

"We are excited by our growing relationship with the Army and this order for sustainment equipment for the BiBs evidences their continued use of and training on these remarkable systems," said WSGI President and CEO, Glenn D. Estrella. "We intend to give the Army our full support as our BiBs are placed through vigorous training exercises and evaluations. We look forward to the opportunity to provide the DoD with a low cost, reliable ISR capability to support the warfighter."

(Image from file)

FMI: www.wsgi.com, www.ltascorp.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC