AD: Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Oct 06, 2014

AD: Boeing Company Airplanes

AD NUMBER: 2014-20-07

PRODUCT: All the Boeing Company Model 747-200C and -200F series airplanes.

ACTION: Final Rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2010-03-05 for the products listed above. AD 2010-03-05 required, for the upper chords of the upper deck floor beam of section 41, an inspection for cracking of certain fastener holes, and corrective action if necessary; and repetitive replacements of the upper chords, straps (or angles), and radius fillers of certain upper deck floor beams and, for any replacement that is done, inspections for cracking, and corrective actions if necessary.

This new AD adds repetitive inspections of the upper chords of the upper deck floor beam of Section 42, repetitive replacements of the upper chords, post-replacement inspections, and corrective actions if necessary. This new AD also adds post-replacement inspections for section 41 and reduces certain compliance times. This AD was prompted by a determination that the upper deck floor beams are subject to widespread fatigue damage (WFD), the existing inspection program is not sufficient to maintain an acceptable level of safety, and the upper chords of the upper deck floor beam of section 42 are subject to the unsafe condition.

The FAA is issuing this AD to detect and correct cracking of the upper chords and straps (or angles) of the floor beams, which could lead to failure of the floor beams and consequent loss of controllability, rapid decompression, and loss of structural integrity of the airplane.

DATES: This AD is effective November 7, 2014.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC