Dream Chaser Spacecraft Passes Another NASA Milestone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Apr 02, 2019

Dream Chaser Spacecraft Passes Another NASA Milestone

Ground And Flight Operations Enabled, First Flight In 2021

Sierra Nevada Corporation’s (SNC) Dream Chaser spacecraft passed NASA’s Integrated Review Milestone 5 (IR5), a key status check on SNC’s performance of a variety of ground and flight operations.

IR5 demonstrates that the Dream Chaser team is on track to operate the space vehicle in advance of the first mission to the International Space Station under the Commercial Resupply Services Contract 2 (CRS-2). “This milestone is a great accomplishment for the team focused on operations development and demonstration. It shows we can operate the Dream Chaser from the ground, including getting critical science in and out of the vehicle,” said John Curry, CRS-2 program director within SNC’s Space Systems business area.

The review included development of the vehicle’s flight computers and software, mission simulator and Mission Control Center.  SNC also performed cargo demonstrations using high fidelity mock-ups of the vehicle and its cargo module, showing loading and unloading time and efficiency.

Milestone testing took place at SNC’s Louisville, Colorado and NASA Kennedy Space Center facilities.  Data was also used from the Dream Chaser 2017 free-flight test at Edwards Air Force Base, California, with the help of NASA's Armstrong Flight Research Center. “Our Dream Chaser team continues to successfully execute milestones as we move closer to getting this spacecraft into space,” said Fatih Ozmen, SNC’s owner and CEO.  “The orbital spacecraft is being built and this milestone demonstrates the vehicle keeps passing key reviews and is making great strides.”

Dream Chaser continues to meet technical and scheduled milestones on its way to first flight in spring 2021. The Dream Chaser will conduct at least six orbiting flights to the space station, delivering equipment and supplies to advance space exploration and then safely return life science and other time-critical items on a conventional runway.

(Source: Sierra Nevada Corp. news release. Image from file)

FMI: www.sncorp.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC