NGC To Break Ground On Space Assembly And Test (M-SAT) Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Jul 13, 2014

NGC To Break Ground On Space Assembly And Test (M-SAT) Facility

Represents $20 Million Investment In New 25,000 Square Foot Building

Northrop Grumman Corporation is investing $20 million to construct a new 25,000 square foot facility to handle space payload integration programs. Construction begins this month and will be completed by a Maryland-based construction company during the summer of 2015. The building will house up to 80 engineers and technicians working on space systems assembly, integration and testing.

U.S. Sen. Ben Cardin and U.S. Reps. C. A. Dutch Ruppersberger and John Sarbanes are expected to attend the groundbreaking. They will be accompanied by Gloria Flach, corporate vice president and president, Northrop Grumman Electronic Systems, and other company officials.

The ceremony will be held at 3:00 p.m. EDT Monday, July 14, at the Back lot of Northrop Grumman Electronic Systems' BWI Campus in Linthicum, MD.

Northrop Grumman has been a pioneer in designing and producing payloads, sensors, systems and solutions for use in space for more than 50 years. From the Gemini Rendezvous Radar Pod to the Apollo 11 Lunar Camera that broadcast man's first steps on the moon, the company's space heritage also includes the Defense Meteorological Satellite Program, the Defense Support Program and the Space-Based Infrared System.

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC