CAE To Develop 6 Additional P-8A Trainers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 04.23.18

Airborne-UnManned 04.24.18

Airborne 04.18.18

AMA Drone Report 04.19.18

Airborne 04.20.18

Airborne-YouTube

Airborne 04.23.18

Airborne-UnManned 04.24.18

Airborne 04.18.18

AMA Drone Report 04.19.18

Airborne 04.20.18

Wed, Nov 30, 2011

CAE To Develop 6 Additional P-8A Trainers

OFTs, Desktop Trainers Included In The Order

As the new Poseidon P-8A moves towards higher production rates and the eventual replacement of the Navy's P-3 fleet, training pilots and crews becomes more critical. CAE announced Monday at the I/ITSEC conference being held in Orlando, FL, that Boeing has ordered six additional P-8A Poseidon operational flight trainers (OFTs) for the United States Navy.

The order was booked in CAE's second quarter ending September 30, 2011 and included in the value of military contracts announced by CAE on October 17, 2011. Boeing, prime contractor for the U.S. Navy P-8A program, is the undisclosed United States customer referenced in that press release.

CAE will manufacture the simulators as well as develop a suite of P-8A Aircraft Equipment enhanced Desktop Environment (AeDTE) trainers, which will be used as role playing stations during training of P-8A aircrews. The P-8A OFTs and AeDTEs are part of a recent contract awarded to Boeing to support low rate initial production lot two (LRIP-II) of the P-8A multi-mission maritime aircraft.

"As the United States Navy continues planning for initial operating capability of the P-8A, CAE is pleased to be working closely with Boeing to deliver the training systems required," said John Lenyo, President and General Manager, CAE USA. "The Navy expects to increase the amount of synthetic training used for aircrew training so the fleet of P-8A operational flight trainers we deliver will play a key role in preparing crews to effectively operate and employ this state-of-the-art aircraft."

The P-8A Poseidon is a new long-range anti-submarine and anti-surface warfare aircraft currently being developed for the U.S. Navy by prime contractor Boeing. The P-8A is a derivative of Boeing's next-generation 737-800 aircraft and will be used for maritime and littoral operations. The U.S. Navy plans to acquire 117 P-8A aircraft to replace its current fleet of P-3C Orion aircraft. The Indian Navy, the first international customer for the P-8, has ordered eight P-8I aircraft.

CAE is already under contract from Boeing to design and manufacture four P-8A OFTs, so this order brings the total number of P-8A OFTs that CAE will develop to ten. CAE designs and manufactures the P-8A OFT hardware to Level D standards, the highest qualification for flight simulators. CAE also provides the 737-800 OFT software baseline and simulation-based software lab environment that is used for P-8A OFT development and integration tasks. CAE then delivers the P-8A OFTs to Boeing, who installs and integrates software specific to the P-8A aircraft and completes delivery to the U.S. Navy.

FMI: www.cae.com

Advertisement

More News

UPDATE: The Dirtiest of Washington Politics? -- ATC Privatization By Deception?

Stunning, Deceptive, Dirty Politics... Shuster Is At It Again, But This Time We Need To React FAST! ANN RealTime News Update, 04.24.18, 2302 ET: Well... initial info suggests that >[...]

AMA Drone Report 04.19.18: AMA Leadership, FAA Reauthorization, Coachella

Also: New French Regs, Drone Boot Camp, Public Safety Drone Standards, DroneShield Protects NASCAR It’s a little bit sad and yet a bit cool to see AMA make an exciting change>[...]

Airborne/Barnstorming 04.23.18: We Can Do So Much Better...

I'll Admit It... We're A Mite Frustrated, But We're ALSO Not Quitting... Ever Comments/Analysis/News/Video by ANN CEO/Editor-In-Chief, Jim Campbell We've accomplished so much over >[...]

Airborne 04.23.18: Hemisphere Suspended, Thunderbirds Fly, Apple v Drones

Also: New NASA Administrator, AD For CFM56-7B, Engine Display Upgrade On C-441, First BBJ MAX Textron Aviation has suspended work on the Citation Hemisphere large business jet, cit>[...]

ANNouncement: Now Accepting Applications For Oshkosh 2018 Stringers!!!

An Amazing Experience Awaits The Chosen Few... E-I-C Note: There's very little we can say yet, but there is a reason why this may be THE year to throw in with ANN to cover the extr>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC