AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne Unmanned-
Alt. Wednesdays

Airborne Flight Training-Alt. Wednesdays

Airborne Unlimited-
Friday

Airborne Special Programs!

Airborne On ANN

Airborne Unlimited--05.27.20

Airborne-Unmanned--05.28.20

NEW! Airborne-Flight Training--05.06.20

Airborne Unlimited--05.22.20

Airborne's Annual April 1st Episode

Airborne-YouTube

Airborne Unlimited--05.27.20

Airborne-Unmanned--05.28.20

NEW! Airborne-Flight Training--05.20.20

Airborne Unlimited--05.22.20

The 2020 Avionics Innovation Preview!

Thu, Jun 30, 2005

AD: Boeing

AD NUMBER: 2005-13-34
MANUFACTURER: Boeing
SUBJECT: Airworthiness Directive 2005-13-34
SUMMARY: This amendment adopts a new airworthiness directive (AD), applicable to certain Boeing Model 777-200 and -300 series airplanes, that requires replacing existing ceiling and sidewall light connectors in the passenger cabin with new connectors, and follow-on actions.

This action is necessary to prevent overheating of the light connectors, which could result in smoke and a possible fire in the passenger cabin. This action is intended to address the identified unsafe condition.

FMI: www.airweb.faa.gov/ad

Advertisement

More News

Tecnam Unveils Jet/Diesel Powered P2010 TDI

Type Certificate Expected By July Tecnam has announced the introduction of a new airframe, with an aero-diesel engine and a Type Certificate expected by July. Burning just 5.2 US G>[...]

Airborne 05.27.20: Virgin Orbit Attempt, WACO YMF-5F Cert, AEA 1Q Report

Also: Ligado Takes More Flak, ERAU Makes Return Plans, CG Helo Rescue, UND Plans Restart It was not the best of days for the team at Virgin Orbit, but it was an educational one. Af>[...]

Airborne 05.27.20: Virgin Orbit Attempt, WACO YMF-5F Cert, AEA 1Q Report

Also: Ligado Takes More Flak, ERAU Makes Return Plans, CG Helo Rescue, UND Plans Restart It was not the best of days for the team at Virgin Orbit, but it was an educational one. Af>[...]

Aero-News: Quote of the Day (05.28.20)

"About 9 seconds after drop, something malfunctioned, causing the booster stage engine to extinguish, which in turn ended the mission. We cannot yet say conclusively what the malfu>[...]

Oh... The Pain! NASA’s SpaceX Demo-2 Launch Rescheduled to Saturday Due to WX

They Only Needed Another 10-20 Minutes To Get Past The Worst of The Weather... NASA and SpaceX scrubbed Wednesday’s launch attempt of the Demo-2 test flight to the Internatio>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2020 Web Development & Design by Pauli Systems, LC