Montana TFR: Until Further Notice | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.19.14 ** HD iPad-Friendly -- Airborne 09.19.14 **
** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **

Wed, Jul 20, 2005

Montana TFR: Until Further Notice

NOTAM:  5/6062 
Issued:  07/19/2005 03:30 
Effective:  Immediately - Until Further Notice 
State:  MT 
Facility:  ZLC - SALT LAKE CITY (ARTCC),UT. 
Type:  HAZARDS 
Description:  SE OF BILLING MT. 

FDC 5/6062 ZLC MT.. FLIGHT RESTRICTIONS SE OF BILLING, MT. EFFECTIVE IMMEDIATELY UNTIL FURTHER NOTICE. PURSUANT TO 14 CFR SECTION 91.137(A)(2) TEMPORARY FLIGHT RESTRICTIONS ARE IN EFFECT WITHIN A 5 NAUTICAL MILE RADIUS OF 450840N/1080601W OR THE BILLINGS /BIL/ VORTAC 137 DEGREE RADIAL AT 45.5 NAUTICAL MILES AT AND BELOW 10000 FEET MSL TO PROVIDE A SAFE ENVIRONMENT FOR FIRE FIGHT. CROW AGENCY-BIA TELEPHONE 406-329-4880 OR FREQ 122.225/BIG HORN IS IN CHARGE OF THE OPERATION. GREAT FALLS /GTF/ AFSS TELEPHONE 406-268-2119 IS THE FAA COORDINATION FACILITY.

FMI: http://tfr.faa.gov

Advertisement

More News

Airborne 09.17.14: Boeing/SpaceX Win CCtCap, Flying Docs Endorse, Jetpack Bucks

Also: Chris Heintz, Lear 70/75 Certs, Beluga Birthday, Leap Frogs 9/11 Jump Cancelled, Lawyers Sue NTSB The Commercial Spaceflight Federation congratulates NASA and the winners of >[...]

AD: Embraer S.A. Airplanes

AD NUMBER: 2014-19-01 PRODUCT: Embraer S.A. Model EMB-505 airplanes (Phenom 300)>[...]

ANN's Daily Aero-Linx (09.19.14)

Basejumper.com A site dedicated to the sport of BASE jumping. BASE is an acronym which stands for Building, Antenna, Span and Earth.>[...]

ANN's Daily Aero-Term (09.19.14): Breakout

A technique to direct aircraft out of the approach stream. In the context of simultaneous (independent) parallel operations, a breakout is used to direct threatened aircraft away f>[...]

Aero-News: Quote Of The Day (09.19.14)

"We're actually already in the process of putting some framework together, but we're going to hit the ground running when we get back in January." Source: U.S. Representative Sam G>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC