L-3 Completes First Phase Of F/A-18C/D Roadmap Procurement Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, Aug 28, 2009

L-3 Completes First Phase Of F/A-18C/D Roadmap Procurement Program

Six Trainers Delivered To USMC, Simulators Upgraded

L-3 Link Simulation & Training (L-3 Link) announced Thursday it has successfully completed the first phase of the U.S. Navy's F/A-18C/D Roadmap Procurement Program (RPP).

L-3 Link received this two-phase, five-year program in 2006. Under the first phase of the program L-3 Link has delivered six new F/A-18C/D Tactical Operational Flights Trainers (TOFTs). In addition, 16 existing U.S. Navy and U.S. Marine Corps F/A-18 simulators have been upgraded to the new F/A-18C/D TOFT configuration.

The new F/A-18C/D TOFTs and upgraded simulators have been integrated with new photo texture databases to increase visual acuity, additional audio capabilities, increased malfunctions and enhanced instructor operator station functionality. Numerous aircraft concurrency upgrades have been integrated on the F/A-18C/D TOFTs to provide each simulator with the platform's latest aircraft capabilities.

"Our dedicated U.S. Navy and L-3 Link team has worked to ensure training device concurrency with the fleet aircraft," said Frank Casano, director of Maritime Programs for L-3 Link. "This high level of cooperation is benefitting U.S. Navy and U.S. Marine Corps pilots today by enabling them to practice essential training and readiness tasks in the simulator before undertaking a mission in an aircraft."

Link F/A 18 Simulator

L-3 Link has begun work on phase two of the program, which calls for delivery of one additional  F/A-18C/D TOFT each to Marine Corps Air Station (MCAS) Iwakuni, Japan; MCAS Miramar, CA.; and the Joint Reserve Base in Fort Worth, Texas. Phase two also will focus on ensuring the training devices remain concurrent with the aircraft, developing additional visual system databases, inserting new training technologies and making improvements in aerodynamic fidelity. These updates will be deployed to all F/A-18C/D training devices in the U.S. Navy and Marine Corps fleet.

FMI: www.L-3com.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC