Navy Awards $1.9B For 3rd Phase Of P-8A Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Oct 18, 2012

Navy Awards $1.9B For 3rd Phase Of P-8A Production

Fleet Receives Fourth Production Poseidon

On the heels of the U.S. Navy announcing on Sept. 21 its plans to buy 11 P-8A Poseidon Multi-Mission Maritime low rate initial production (LRIP) Lot III aircraft from Boeing, the fourth production aircraft was delivered to the fleet Oct. 9. “The delivery of the fourth LRIP Lot 1 aircraft is a great way to start the month,” said Capt. Scott Dillon, Maritime, Patrol and Reconnaissance Aircraft Program Office’s (PMA-290) program manager.

September was a multi-milestone month for the multi-mission program team, as this $1.9 billion contract modification announcement follows the delivery of the third LRIP Lot 1 aircraft, in addition to the program entering into the initial operational testing and evaluation period. “This contract modification and the delivery of the newest LRIP aircraft to fleet operators, keeps the program moving in the right direction,” Dillon said. “I am proud of the P-8A team for all of these significant milestones occurring in one month – job well done.”
 
The P-8A integrated test squadron now consists of six test aircraft, the first three being instrumented test aircraft. These flight-test aircraft are being used for airworthiness testing and envelope expansion, mission systems testing, and stores separation testing. The remaining three are production representative aircraft used to support the conduct of operational test and evaluation. Pax River’s Air Test and Evaluation Squadron ONE (VX-1) is the Navy’s operational test squadron that will be focusing on completing developmental testing, preparing and participating in operational testing, and initiating fleet transition.
 
The P-8A Poseidon is the first Navy combat aircraft built from the ground up on a commercial production line, which also allows the program to reduce time and overall cost for the Navy. Developmental testing to date indicates the aircraft meets program requirements and is on track for upcoming milestones, with the ultimate goal of initial operational capability (IOC) in 2013.

To date, the test aircraft have completed more than 600 sorties and 2,500 flight hours. Throughout this year and in addition to ongoing developmental flight test, the operational test squadron participated in several major 2012 exercises including the U.S. Navy’s Bold Alligator exercise in February; United Kingdom’s Joint Warrior exercise in April and this month; Australia’s Tactical ASW Maritime exercise in June; U.S. Navy’s Rim of the Pacific exercise in July and August; and U.S. Navy’s Valiant Shield in Guam last month.
 
“These exercises provide real-world tests of the P-8A’s capabilities and bring the Navy one step closer to IOC,” Dillon said. “The Navy-Boeing P-8A team can be very proud of these major program accomplishments and of their contribution to the Navy’s warfighting readiness.”

(Image courtesy U.S. Navy)

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC