AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Jul 04, 2010

AD: Boeing

AD NUMBER: 2010-14-07

MANUFACTURER: The Boeing Company Model 747 Airplanes
SUBJECT: Airworthiness Directive 2010-14-07

SUMMARY: The FAA is superseding an existing airworthiness directive (AD), which applies to certain Model 747 airplanes. That AD currently requires repetitive inspections of the body station (BS) 2598 bulkhead, and corrective actions if necessary. That AD also currently requires a terminating modification for certain repetitive inspections and a post- modification inspection of the modified area. This new AD continues to require those actions using revised service information. For certain airplanes, this AD requires new repetitive inspections, an interim modification, and post-interim modification inspections. For certain airplanes, this AD requires replacing any previously repaired aft inner chord and reinstalling the terminating modification. For airplanes that are converted to the Model 747-400 large cargo freighter (LCF) configuration, this new AD reduces the threshold and repeat intervals of certain post-modification inspections. For all airplanes, this new AD also requires certain inspections of the upper aft outer chords and diagonal brace attachment fittings, flanges, and rods to continue after the terminating modification. This AD results from reports of cracked aft inner chords on airplanes after certain requirements of the existing AD were done. The FAA is issuing this AD to prevent fatigue cracking of the BS 2598 bulkhead structure, which could result in inability of the structure to carry horizontal stabilizer flight loads, and loss of controllability of the airplane.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/E9BDB3585682700086257753005E0EF8?OpenDocument

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC