Shuttle Crew Checks Out Equipment For Return To Flight Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 22, 2005

Shuttle Crew Checks Out Equipment For Return To Flight Mission

The astronauts of the Space Shuttle Discovery got a chance to work with some of the equipment they will be taking to space. Flight commander Eileen Collins and her crew were at NASA's Kennedy Space Center, Fla., for the Payload Crew Equipment Interface Test.

The Return to Flight mission of the Space Shuttle (STS-114) is targeted for launch during a window from May 15 to June 3. Returning the Shuttle to flight and completing the International Space Station are the first steps in the Vision for Space Exploration, a stepping-stone strategy toward new exploration goals. STS-114 is the first of two test flights following the Columbia accident. The seven-member Discovery crew will fly to the Station to evaluate procedures for flight safety, including orbiter inspection and repair techniques, and will deliver much-needed supplies.

The astronauts performed tests today to ensure the equipment for the mission's three spacewalks worked properly, and they inspected the cargo containers installed in the Italian-built Multi-Purpose Logistics Module, called Raffaello. They performed fit checks on the Thermal Protection System (TPS) repair sample box, the Control Moment Gyro (CMG), and the External Stowage Platform-2 (ESP2).

The sample box contains pieces of the Shuttle's heat-shielding tile. The samples will enable the crew to test new on-orbit repair techniques recommended by the Columbia Accident Investigation Board.

The new gyroscope will replace an inoperable one on the International Space Station. CMGs provide attitude control for the Station, keeping it properly positioned in space. The ESP2, similar to a large toolbox, will carry replacement parts to the Station. The platform will be deployed, attached to the Station's airlock and used as a permanent spare parts facility.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC