Air Pacific Signs For Five Dreamliners | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.31.15

Airborne 09.01.15

Airborne 09.02.15

Airborne 09.03.15

Airborne 08.28.15

Airborne Hi-Def On YouTube

Airborne 08.31.15

Airborne 09.01.15

Airborne 09.02.15

Airborne 09.03.15

Airborne 08.28.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Wed, Apr 26, 2006

Air Pacific Signs For Five Dreamliners

Latest Deal Takes The 787 Past 350 Orders

Air Pacific, the flag carrier of the South Pacific island republic of Fiji, and Boeing announced an order Tuesday for five Boeing 787-9 Dreamliners, with three additional purchase rights. With this announcement, total orders for the Boeing 787 family have reached 350 airplanes from 26 customers.

The first of the long-range airliners will be delivered in 2011, and will fly the airline’s key routes from Nadi, Fiji, to Australia, New Zealand, North America and Japan. The new Dreamliners will eventually replace two Boeing 747-400s and one 767-300ER.

No list price is currently published for the 787-9 model.

The order was included last week on the Boeing Orders & Deliveries Web site, attributed to an unidentified customer. Today’s announcement coincides with the second anniversary of Boeing’s launch of the 787 program.

"This is a momentous decision for Air Pacific that has taken many months of detailed study and negotiation," said Gerald Barrack, chairman of Air Pacific, Ltd. "I am pleased with the price negotiated and the certainty this decision provides for Air Pacific, for the future of air transport links within the Pacific and particularly for the future growth of Fiji’s tourism and export industries."

The contract signing ceremony held today also marks Barrack’s retirement from the airline he has led for nearly 20 years.

"We are delighted to have concluded an extensive evaluation and negotiation, and are convinced that the right aircraft has been selected," said John Campbell, Air Pacific managing director and CEO.

Boeing reports the 787 will use 20 percent less fuel for comparable operations than similarly sized airplanes, while traveling at speeds similar to today’s fastest commercial airplanes -- Mach 0.85. The 787-9 is the largest version of the 787 family currently being offered to airlines, and will carry 250 to 290 passengers on routes of 8,600 to 8,800 nautical miles.

"As the airline is an all-Boeing operator, Air Pacific and Boeing have enjoyed a great relationship for many years," said Rob Pasterick, vice president and chief financial officer, Boeing Commercial Airplanes, representing the company at the Suva press conference and contract signing ceremony. "Air Pacific is one of the great success stories in South Pacific aviation, having consistently produced profits in the face of tough competition. We are delighted that Air Pacific has selected the 787 after its rigorous evaluation."

Air Pacific has yet to choose between GE Aircraft Engines' GEnx or Rolls-Royce's Trent 1000 powerplants for its new airplanes.

Air Pacific began operations in 1951 and expanded as tourism and export markets grew. The airline was the region’s inaugural customer for the Boeing Next-Generation 737 family with an order in 1996, followed by the 1998 delivery of a 737-700 and the 1999 delivery of two 737-800s.

FMI: www.airpacific.com, www.boeing.com

Advertisement

More News

Parsing The Model Aircraft Advisory Circular

Attorney Jonathan Rupprecht Finds Several Issues With The FAA's New AC On August 10, 2014 FAA accidentally canceled AC 91-57, which had been around for a little more than 34 years.>[...]

Rockwell Collins Debuts Pro Line Fusion For Commercial Helicopters

Avionics On Display At The China Helicopter Exposition Following integration into 20 aircraft ranging from business jets to military flight decks, Rockwell Collins will unveil Pro >[...]

Airborne 09.03.15: Falcon 9 Delayed, UAV 'Favor' Fined, Impounded In The UK

Also: Rob Holland's Gold, API: Innovative Aviation Content, Master Instructors, Wallops' New Launch Command Ctr, Webb Space Telescope, Satellite Broadband Network, Another FAA Fine>[...]

AeroSports Update: Cubs Vs Champs

In The Lee Bottom Flying Field Event Contest, Piper Cubs Win The First Round Of The Champs Vs Cubs Challenge Lee Bottom Flying Field, an airport favored by grassroots aviators, wil>[...]

AD: Vulcanair S.p.A. Airplanes

AD NUMBER: 2015-18-01 PRODUCT: Vulcanair S.p.A. Model P.68R airplanes.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC