Last Flight Test Dreamliner Enters Final Assembly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 01.16.17

Airborne 01.17.17

Airborne 01.18.17

Airborne 01.19.17

Airborne 01.13.17

Airborne Hi-Def On YouTube

Airborne 01.16.17

Airborne 01.17.17

Airborne 01.18.17

Airborne 01.19.17

Airborne 01.13.17

Fri, Mar 20, 2009

Last Flight Test Dreamliner Enters Final Assembly

Boeing Has 878 Orders For Delayed Airliner

While we're still months away from the first flight of Boeing's 787 Dreamliner, the planemaker announced Thursday the sixth and final 787 Dreamliner designated for flight test is now undergoing final assembly in Everett, WA. The airplane, designated ZA006, will be powered with General Electric GEnx engines.

Less than two months after production resumed following last year's machinists strike, Boeing said progress continues on the fleet. The first flight test airplane, ZA001, is getting its paint touched up this week before finishing factory testing.

Power was brought onto the second airplane, ZA002, in late February, and Boeing says build verification tests are progressing well. Production work also continues on ZA003, ZA004 and ZA005. In all, assemblies for 31 Dreamliners are currently in production throughout the supply chain.

The 787 Dreamliner has orders for 878 airplanes from 57 customers... 33 frames down from previous totals, due to several cancellations and order conversions.

FMI: www.boeing.com

Advertisement

More News

Could have Been Worse -- FAA, Skypan International Reach Fine Agreement

Company Had Faced A $1.9 Million Fine A comprehensive settlement agreement has been reached between the FAA and SkyPan International, Inc., of Chicago. The agreement resolves enfor>[...]

Airborne 01.18.17: AirVenture 2017, King Schools Drone Test, Tico Warbirds

Also: Plastic Fuel, 747 Down, Great Lakes, Lily Suit, Neffenger Stepping Down, Coast Flt Training, Boeing-SpiceJet EAA-AirVenture is many things to many people, and not the least o>[...]

Airborne 01.18.17: AirVenture 2017, King Schools Drone Test, Tico Warbirds

Also: Plastic Fuel, 747 Down, Great Lakes, Lily Suit, Neffenger Stepping Down, Coast Flt Training, Boeing-SpiceJet EAA-AirVenture is many things to many people, and not the least o>[...]

Airborne 01.17.17: Gene Cernan, KSMO NIMBY's Threaten AvBiz, Lily Drones Kaput

Also: Gone West: Bill Bordeleau, Aero-Calendar, Duncan Aviation, Norwegian Air, Drone Advisory, QinetiQ, Drone v Space Needle We’re sorry to report that, according to a Tweet>[...]

FAA Issues AD For Diamond DA42 Aircraft

Has Received Reports Of Uncommanded Engine Shutdowns In Flight The FAA has issued an AD for Diamond DA42 aircraft following reports of uncommanded engine shutdowns in flight.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC