Factory Leasing Program Announced For Great Lakes By WACO | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Wed, Dec 03, 2014

Factory Leasing Program Announced For Great Lakes By WACO

Designed To Support Upset Prevention And Recovery Training Flight Schools

WACO Aircraft Corp. has rolled out a new Factory Direct leasing program for the Great Lakes 2T-1A-2. The company says the program is designed to support the Upset Prevention and Recovery Training needs for Flight Schools and help them comply with FAA AC 120-UPRT, FAA AC 120-109 and upcoming ICAO 10011 “Airplane Upset Prevention and Recovery Training” manual guidelines.

This simple lease plan is comprised of a low monthly base lease rate that includes flight hours, then an hourly rate for time over the included base. The program includes all scheduled maintenance. The program can be custom tailored for the unique needs of each school and features a streamlined approval process.
 
The new Great Lakes by WACO is a fully aerobatic, 180 horsepower aircraft featuring docile ground handling yet excellent aerobatic capability. The company says those characteristics make it "the perfect trainer for Loss of Control In-Flight (LOC-I) programs."
 
Integrating Upset Prevention and Recovery Training into your flight curriculum is an upcoming requirement for all part 141 schools.
 
The lease includes:

  • All Scheduled Maintenance including parts
  • Oil Changes (every 50 hours)
  • 100 Hour Inspections
  • Annual Inspections
  • Pitot and Static certification
  • Squawks affecting the airworthiness of the airplane
  • Engine Replacement at TBO (1600 hours)
  • Complete aircraft overhaul at the factory every 3200 hours

The airplane has been certified by both FAA and EASA for transition training for instructors needing minimal checkout time.

(Image provided by WACO Aircraft)

FMI: www.wacoaircraft.com

 


Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC