Boeing Completes Preliminary Design Review Of CTS-100 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Mar 16, 2012

Boeing Completes Preliminary Design Review Of CTS-100

Commercial Crew Space Transportation Vehicle Includes Launch Vehicle And Ground System

A Preliminary Design Review (PDR) of Boeing’s integrated Commercial Crew Space Transportation system, which includes the Crew Space Transportation (CST)-100 spacecraft,was completed on March 12. The integrated system will provide the United States with the capability to transport people and cargo to the International Space Station (ISS), the Bigelow Space Complex and other destinations in low Earth orbit.

The system PDR, which included the CST-100 spacecraft (Boeing artist's concept pictured), launch vehicle and ground system, evaluated technical adequacy, progress and risk resolution of the design and test approach. “The progress made by the Commercial Crew team has been outstanding. It is clear that this team has the discipline and the right design, test and safety approaches and processes to ensure a safe, reliable and affordable transportation system by the middle of the decade,” said John Mulholland, vice president and program manager, Boeing Commercial Programs.

“Boeing is leveraging not only the enduring spaceflight capabilities resulting from our 50-year heritage supporting human spaceflight, but also our contemporary expertise and experience, to achieve milestones toward the future of human spaceflight such as this PDR,” Mulholland added.

The PDR included representatives from Boeing, NASA, the Federal Aviation Administration and independent consultants. They examined all milestones accomplished in the development of the integrated system design since the Delta System Definition review that was conducted in May 2011, under NASA’s Commercial Crew Development Space Act Agreement.

Boeing has scheduled additional tests to be performed in 2012, including a launch abort engine hot fire test series, which was successfully completed on March 9, parachute drop tests in April, a landing air bag test series in May, a forward heat shield jettison test in June, and an attitude control engine hot fire test in June, to gather additional data on key functional elements of the spacecraft design.

The Boeing Commercial Crew program includes the design, manufacture, test and evaluation, and demonstration of the CST-100 spacecraft, launch vehicle and mission operations -- all part of Boeing’s Commercial Crew Transportation System -- for NASA’s Commercial Crew Development program. This system will provide crewed flights to the ISS and also support Bigelow Aerospace’s orbital space complex. The program is based on Boeing’s experience and innovation of over 50 years of human spaceflight and nearly 100 years of commercial aviation.

The CST-100 is a reusable capsule-shaped spacecraft based on proven materials and subsystem technologies that can transport up to seven people, or a combination of people and cargo. Boeing has designed the spacecraft to be compatible with a variety of expendable rockets. The company has selected the United Launch Alliance’s Atlas V launch vehicle for initial CST-100 test flights in 2015.

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC