AD: Airbus Helicopters Deutschland GmbH Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Mar 15, 2019

AD: Airbus Helicopters Deutschland GmbH Helicopters

AD NUMBER: 2019-05-05

PRODUCT: Eurocopter Deutschland GmbH Model MBB-BK 117 A-1, MBB-BK 117 A-3, MBB-BK 117 A-4, MBB-BK 117 B-1, MBB-BK 117 B-2, and MBB-BK 117 C-1 helicopters.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 97-26-03 for the aircraft listed above. AD 97-26-03 required visual inspections for cracks in the ribbed area of the main rotor (M/R) mast flange (flange).

Since issuing AD 97-26- 03, the FAA has determined that a certain reinforced M/R mast is not affected by the unsafe condition. This new AD retains the requirements of AD 97-26-03 and removes a certain M/R mast from the applicability.

DATES: This AD is effective April 17, 2019.

COST: The FAA estimates that this AD affects 62 helicopters of U.S. Registry. Operators may incur the following costs in order to comply with this AD:

Labor costs are estimated at $85 per work-hour.

Visually inspecting the flange for a crack requires 0.25 work-hour for an estimated cost of about $21 per helicopter and $1,302 for the U.S. fleet per inspection cycle. Replacing the M/R mast requires 10 work-hours and parts cost $50,000 for an estimated cost of $50,850 per helicopter.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC